Ciena 3916 AC Standard Hardware Installation And Start-Up Manual

Ciena 3916 AC Standard Hardware Installation And Start-Up Manual

Service delivery switch
Table of Contents

Advertisement

3916 Service Delivery Switch
Hardware Installation and Start-up Manual
3916 AC Standard (170-3916-900)
3916 DC Standard (170-3916-901)
3916 Dual AC Standard (170-3916-902)
3916 AC Mini (170-3916-904)
3916 Dual AC Mini (170-3916-906)
What's inside...
Overview
Installation
Turning Up the System
LED Overview
Technical Specifications
Regulatory Compliance
Reset Button
009-3226-001 - Standard Revision E
July 2015
©
Copyright
2013-2015 Ciena
®
Corporation. All rights reserved.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3916 AC Standard and is the answer not in the manual?

Questions and answers

Summary of Contents for Ciena 3916 AC Standard

  • Page 1 3916 Service Delivery Switch Hardware Installation and Start-up Manual 3916 AC Standard (170-3916-900) 3916 DC Standard (170-3916-901) 3916 Dual AC Standard (170-3916-902) 3916 AC Mini (170-3916-904) 3916 Dual AC Mini (170-3916-906) What’s inside... Overview Installation Turning Up the System LED Overview...
  • Page 2 While the information in this document is believed to be accurate and reliable, except as otherwise expressly agreed to in writing CIENA PROVIDES THIS DOCUMENT “AS IS” WITHOUT WARRANTY OR CONDITION OF ANY KIND, EITHER EXPRESS OR IMPLIED. The information and/or products described in this document are subject to change without notice.
  • Page 3 Termination shall be without prejudice to any other rights or remedies Ciena may have. In the event of any termination you will have no right to keep or use the...
  • Page 4 PROGRAMS, EVEN IF INFORMED OF THE POSSIBILITY OF SUCH DAMAGES IN ADVANCE 7 General. Ciena may assign this Agreement to any Ciena affiliate or to a purchaser of the intellectual property rights in the Software, but otherwise neither this Agreement nor any rights hereunder may be assigned nor duties delegated by either party, and any attempt to do so will be void.
  • Page 5 — Overview material has been moved to 39XX/51XX Product Fundamentals — Optics information remains in Packet Networking Transceivers Reference (009-2011-602) — Orderable part number information removed. For ordering assistance please contact your Ciena representative. October 2012 • Revision B, Standard: — Change title of document —...
  • Page 6 “Creating a New User Account” on page 3-3 — Updated “Ethernet Cables” on page 2-12 — Updated“10/100/1000 Mbps Port LEDs” on page 4-5 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 7: Table Of Contents

    Mounting the Chassis (Supplemental Ground not required) in a Frame Installation 2-24 Mounting the Chassis and Installing Supplemental Ground in a Wall Mount Installation 2-25 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 8 10/100/1000 Mbps Port LEDs 4-5 Reset Button Technical Specifications Regulatory Compliance Canada 7-2 CE Compliance 7-2 FCC Statement 7-3 VCCI - Japan 7-3 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 9: About This Document

    Installation of 3916 Service Delivery Switch from Ciena Corporation. The following versions of the 3916 are available: • 3916 AC Standard (170-3916-900) with integrated front fixed AC power supply in the standard chassis size • 3916 Dual AC Standard(170-3916-902) with two integrated front fixed AC power supplies in the standard chassis size •...
  • Page 10 About this Document Related Documentation The latest version of this document, release notes, and all Ciena documentation are available through the Ciena website at: http://www.ciena.com. The following list contains the names of the related documents in the suite: •...
  • Page 11 About this Document xi 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 12 About this Document 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 13: Overview

    Overview The Ciena Service Delivery Switch (SDS) products provide Ethernet connectivity to buildings and residences to deliver high-speed voice, video, and data connectivity. SDS devices are designed to lower the overall cost of building out a fiber network. The 3916 small SDS is a low port count Carrier Ethernet platform providing premium Ethernet capability and targeting highly competitive Network Termination and Intelligent Demarcation applications.
  • Page 14 3916 is contained in 39XX/51XX Product Fundamentals. The SDS units are designed to work with other Ciena products to deliver complete, integrated service offerings from a single provider or multiple providers. The SDS devices incorporate advanced QoS capabilities, flexibility through pluggable optics, superior multicast control, manageability, and a small form factor chassis to present the industry’s leading fiber-to-the-building...
  • Page 15 Note 1: For the combo ports, only one of the two ports will be active. Either the copper or the optical port will be active. Note 2: Only Ciena approved SFPs can be used with the 3916. For more information see Packet Networking Transceivers Reference (009-2011-602).
  • Page 16 1-4 Overview Figure 1-1 View of the 3916 (Standard Chassis) 3916 AC Standard 3916 DC Standard 3916 Dual AC Standard Figure 1-2 View of the 3916 (Mini Chassis) 3916 Single AC Mini 3916 Dual AC Mini 3916 Service Delivery Switch...
  • Page 17: Installation

    Please review the safety information before beginning the installation. WARNING Read all installation instructions before connecting a 3916 device to a power source. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 18 WARNING The chassis of the 3916 should never be opened under any circumstances. Opening the chassis will void the warranty. The system chassis must be returned to Ciena for service or replacement. Power supply modules and transceivers are field-replaceable, however, the modules or transceivers must be returned to Ciena for service or replacement.
  • Page 19 WARNING For pluggable equipment, the socket outlet shall be installed near the equipment and be easily accessible. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 20: Package Contents

    Table 2-1 on page 2-9 provides a summary of the DC lugs that are recommended for use with the 3916. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 21: Mounting The 3916

    The system must be placed on a non- combustible surface. “To Install 3916 on a Desktop” on page 2-17 for a high level procedure. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 22: Grounding The Chassis

    Common Bonding Network (CBN). The supplemental ground connection is required on 3916 DC Standard installations. The supplemental ground connection is optional on 3916 AC Standard and 3916 Dual AC Standard installations. Mini chassis systems do not require a supplemental ground connection.
  • Page 23: Power Cabling

    Installing Power to a 3916 AC System Four 3916 systems with AC power exist: • 3916 AC Standard (170-3916-900) with a single integrated front fixed AC power supply • 3916 Dual AC Standard (170-3916-902) with two integrated front fixed AC power supplies •...
  • Page 24 WARNING For pluggable equipment, the socket outlet shall be installed near the equipment and be easily accessible. Ciena offers the following AC power cables for the 3916: • AC Power Cord, IEC C13, Europe •...
  • Page 25: Installing Power To A 3916 Dc System

    A readily accessible disconnect device shall be incorporated external to the equipment. “Installing a DC Power Cable” on page 2-34 for a procedure. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 26: Transceivers

    Note: RJ-45 UNI ports require the use of shielded cables to meet class B emissions requirements. Note: XCVR-GETDM3 can only be used in an FCC or CISPR class A emissions environment. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 27: Cable Installation And Guidelines

    Note: Fiber optic cables are not affected by electrical interference. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 28: Connecting Cables To The 3916

    2-12 Installation Connecting Cables to the 3916 When connecting cables to the 3916, always make only one connection at a time. Ciena recommends that cables be connected in the following order: • Fiber cables first • Ethernet cables last In order for two devices to communicate properly, the transmit ports on the first device must be connected to the receive ports of the second device.
  • Page 29: Initial Configuration

    If all other troubleshooting methods have been exhausted, recovery may be possible using the Reset button. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 30: To Install 3916 In A Frame

    “Installing a DC Power Cable” on page 2-34 Install SFP optics, see “To Install a Pluggable Optic” on page 2-37. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 31 Install faceplate cabling for the UNI and NNI connections. See “Cable Installation and Guidelines” on page 2-11. You have installed the 3916 in a frame. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 32: To Install 3916 On A Wall

    Install faceplate cabling for the UNI and NNI connections. See “Cable Installation and Guidelines” on page 2-11. You have installed the 3916 on a wall. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 33: To Install 3916 On A Desktop

    Verify that the AC or DC LED (as appropriate) is green and that the PWR LED on the front of the device is also green. You have installed the 3916 on a desktop. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 34: Installing The Mounting Brackets For A 19-Inch Frame Installation

    Frame Installation” on page 2-22 – “Mounting the Chassis (Supplemental Ground not required) in a Frame Installation” on page 2-24. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 35: Installing Mounting Brackets For A 23-Inch Frame Installation

    Figure 2-4 Bracket mounting holes (23-inch mini bracket: top left; 23-inch standard bracket: bottom right) Right Bracket Left Bracket 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 36 Frame Installation” on page 2-22 – “Mounting the Chassis (Supplemental Ground not required) in a Frame Installation” on page 2-24. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 37: Installing The Mounting Brackets In A Wall Mount Installation

    Ensure that the reinforced mounting surface is capable of supporting at least 5 pounds. Figure 2-5 Installed Mounting Brackets - Wall Mount Orientation (3916 AC Standard system shown) Step Action Determine the wall mount orientation. Position the 3916 so that the fans on the right side of the chassis are located at the bottom of the unit.
  • Page 38: Mounting The Chassis And Installing Supplemental Ground In A Frame Installation

    Note: A supplemental ground connection is required for 3916 DC Standard installations. The supplemental ground connection is optional for 3916 AC Standard and 3916 Dual AC Standard installations. A supplemental ground connection is not required or available for mini chassis systems. For systems that do not require a supplemental ground connection see “Mounting the Chassis (Supplemental Ground not...
  • Page 39 You have mounted and grounded the 3916. You are now ready to proceed with installing the Cable Support Brackets. See “Installing the Cable Support Brackets” on page 2-29. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 40: Mounting The Chassis (Supplemental Ground Not Required) In A Frame Installation

    Note: A supplemental ground connection is required for 3916 DC Standard installations. The supplemental ground connection is optional for 3916 AC Standard and 3916 Dual AC Standard installations. A supplemental ground connection is not required or available for mini chassis systems. For systems that require a supplemental ground connection see “Mounting the Chassis and Installing Supplemental...
  • Page 41: Mounting The Chassis And Installing Supplemental Ground In A Wall Mount Installation

    Note: A supplemental ground connection is required for 3916 DC Standard installations. The supplemental ground connection is optional for 3916 AC Standard and 3916 Dual AC Standard installations. A supplemental ground connection is not required or available for mini chassis systems. For systems that do not require a supplemental ground connection see “Mounting the Chassis (Supplemental Ground not...
  • Page 42 “Installing an AC Power Cable in a Standard Chassis system” on page 2-30 “Installing a DC Power Cable” on page 2-34. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 43: Mounting The Chassis (Supplemental Ground Not Required) In A Wall Mount Installation

    Note: A supplemental ground connection is required for 3916 DC Standard installations. The supplemental ground connection is optional for 3916 AC Standard and 3916 Dual AC Standard installations. A supplemental ground connection is not required or available for mini chassis systems. For systems that require a supplemental ground connection see “Mounting the Chassis and Installing Supplemental...
  • Page 44 You have mounted the 3916. You are now ready to proceed with installing the Cable Support Brackets. See “Installing the Cable Support Brackets” on page 2-29. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 45: Installing The Cable Support Brackets

    “Installing an AC Power Cable in a Standard Chassis system” on page 2-30 “Installing a DC Power Cable” on page 2-34. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 46: Installing An Ac Power Cable In A Standard Chassis System

    Plug the other end of the power cord into a power source. The 3916 will turn on. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 47 The AC power supply has now been cabled and the system has been powered on. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 48: Installing An Ac Power Cable In A Mini Chassis System

    Thread the tie wrap through the tail head and pull tight. e. Trim off any excess tie wrap material. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 49 The AC power supply has now been cabled and the system has been powered on. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 50: Installing A Dc Power Cable

    Figure 2-10 on page 2-35 shows the DC wiring installed and the plastic terminal block cover removed. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 51 Using a flat head screwdriver, re-install the plastic terminal block cover removed in step 3 on page 2-34. See Figure 2-11 on page 2-36. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 52 The 3916 will turn on. The DC power supply has now been cabled and the system has been powered on. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 53: To Install A Pluggable Optic

    Figure 2-12 shows the location of these different ports on the faceplate of the 3916. Figure 2-12 Front view of the 3916 (3916 AC Standard system shown) The following procedure explains how to install an SFP. Step Action Hold the optic module by the sides and position it so that the label is facing up and the 20-pin connector card (rear of the optic) is facing the empty optic slot.
  • Page 54 CAUTION This is a Class 1 laser product. Only optics that have been qualified by Ciena should be used in this product. The list of supported optics is included in Packet Networking Transceivers Reference (009-2011-602). These optics have been demonstrated to meet Class 1...
  • Page 55: To Remove A Pluggable Optic

    Pluggable optic installation instructions are provided in “To Install a Pluggable Optic” on page 2-37. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 56: Installing A Fiber Optic Cable

    Link LED for the port should become activated. See “LED Overview” on page 4-1 for more information. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 57: Turning Up The System

    • “Logging Out of the System” For information on managing system software, including performing software upgrades, see 39XX/51XX Configuration. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 58: Logging In Through The Serial Console Port

    Console Serial Adapter, RJ-45 EIA pinout to DB-9 male connector, 6 inches — must be connected to a customer supplied null modem cable Note: The console cable can be used for a number of Ciena products within the Packet Networking portfolio.
  • Page 59 Creating a New User Account The 3916 is preconfigured with default user accounts. The default user accounts are common to all Ciena Carrier Ethernet products and are not confidential. When you turn-up the system you need to configure new user accounts and delete the default accounts in order to protect the system.
  • Page 60 For more information on provisioning commands for the remote interface, see the 39XX/51XX Command Reference . For a procedure see “Configuring the Remote Management Interface” on page 3-13. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 61 The following special characters are not allowed: “ % * ? ! For a procedure see “Setting the System Host Name” on page 3-15. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 62 For a procedure see “Logging out of the System” on page 3-16. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 63: Logging In Through The Serial Console Port

    Enter the default user name and password. username = su password = wwp You have logged in to the system. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 64 For more information about user create command options, refer to the Administration and Security document for the SAOS release running on the system. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 65 +----------------------------------+-----------------+ SAOS 6.10. 6.11, and 6.12 The following example creates the super user account, NewSuper, with the password changeme. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 66 | admin | esmUser | super | gss | diag | su | super | user | limited +----------------------------------+---------------+-------+ 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 67: Deleting A User Account

    When you are finished deleting user accounts, save and complete the process. configuration save You have deleted a user account. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 68: Managing Licenses

    Partial License Detected - This means that one or more, but not all, operationally enabled modules have a key installed for this license. You have installed the license. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 69: Configuring The Remote Management Interface

    Validate that your changes were made. interface remote show Save and complete the process. configuration save You have configured the remote management interface. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 70: Accessing The Cli Using Telnet

    SAOS is True Carrier Ethernet TM software. Welcome to the shell. You have logged in to the CLI using Telnet. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 71: Setting The System Host Name

    _alpha_MainSt_CO>: system set host-name 3916_Alpha_MainSt_CO Save and complete the process. configuration save You have set the System Host Name. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 72: Logging Out Of The System

    Remove the cable connecting the console port to the serial port on the terminal or PC. You have logged out of the system. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 73: Led Overview

    Figure 1-2 on page 1-4 shows the faceplate of the unit and the locations of the different ports on mini chassis systems. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 74: Unit Status Leds

    Blinking Green System is initializing and performing self tests. ALRM Normal operating conditions. Yellow An error has been detected. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 75: Power Status Leds

    Power Status LEDs The placement of power status LEDs varies from system to system as follows: • 3916 AC Standard — no power supply LEDs. The power to the system is either on or off. • 3916 DC Standard — no power supply LEDs. The power to the system is either on or off.
  • Page 76 Power is on and operating normally. PS B No input power present or failure condition detected. Green Power is on and operating normally. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 77: 10/100/1000 Mbps Port Leds

    Figure 4-6. Figure 4-5 10/100/1000 Mbps Port LEDs (Standard chassis) Figure 4-6 10/100/1000 Mbps Port LEDs (Mini chassis) 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 78 The port is currently receiving or transmitting Ethernet packets. Port speed is 100 Mbps. (Right LED) Yellow Port speed is 1000 Mbps. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 79: Reset Button

    VLAN. Instructions for initiating a soft reset are included in the 39XX/51XX Command Reference . 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 80 5-2 Reset Button 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 81: Technical Specifications

    • Ports 5 and 6 speed is 1000 Mbps UNI Ports as follows: RJ-45 • Ports 1 and 2 speed is 10/100/1000 Mbps Console Port RJ-45 (EIA-561) 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 82 (1.71 in H x 10.85 in W x 6.78 in D) Rack Unit Height 1 RU Weight (system and SFPs) • 3916 AC Standard 2.3 kg (5.1 pounds) • 3916 DC Standard 2.3 kg (5.1 pounds) • 3916 Dual AC Standard 2.7 kg (6 pounds)
  • Page 83: Regulatory Compliance

    EN 61000-3-2 (2006, A1, A2)) FCC Part 15 (2009) ICES-003 Issue 4 (2004) (Canada) Environmental RoHS 2002/95/EC WEEE 2002/96/EC 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 84: Canada

    Note: Shielded cables are required to meet Class B. Some of the supported optics do not meet the Class B requirements. See Packet Networking Transceivers Reference (009-2011-602) for more information. 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 85: Fcc Statement

    If necessary, the user should consult the dealer or an experienced radio/ television technician for additional suggestions. Modifications to this product not authorized by Ciena could void the FCC approval and negate your authority to operate the product. VCCI - Japan...
  • Page 86 7-4 Regulatory Compliance 3916 Service Delivery Switch Hardware Installation and Start-up Manual 009-3226-001 Standard Revision E © ® Copyright 2013-2015 Ciena Corporation July 2015...
  • Page 88 Hardware Installation and Start-up Manual © ® Copyright 2013-2015 Ciena Corporation. All rights reserved. Publication: 009-3226-001 Document status: Standard Revision E Document release date: July 2015 CONTACT CIENA For additional information, office locations, and phone numbers, please visit the Ciena web site at www.ciena.com...

Table of Contents

Save PDF