SL1000 Getting Started Guide
Connecting Power & Starting Up the SL1000 System
1. Before Starting Up the System
Before starting up the system, make sure:
• KSU(s) is/are installed correctly.
• All extensions are cabled correctly.
• All earth ground and PSTN Trunks are cabled correctly.
• All PCBs are configured, equipped, and strapped correctly.
• AC power cord is cabled correctly.
• At least one Display type Multi-Line Telephone is connected to the system. (for Programming)
• Pull out the Lithium Battery protection sheet, before start up the system.
Plug the AC Power Cord
The AC power switch and AC power inlet are located at the left side of each KSU. The AC power cord is
attached to each KSU, and is connected to the AC inlet and the commercial AC power socket.
Power Switch
20