Q U I C K S TA R T G U I D E
Zenith ZTX series
Enclosed ATS, 30-1200 A, 200-480 Vac
This document is not intended to replace document 1SCC303022M0201, ZTX series O&M,
which is called out in some cases for further detail. This quick start guide is intended to
help the user power the ATS and make it fully operational with a few simple steps.

Advertisement

loading

Summary of Contents for ABB Zenith ZTX Series

  • Page 1 — Q U I C K S TA R T G U I D E Zenith ZTX series Enclosed ATS, 30-1200 A, 200-480 Vac — This document is not intended to replace document 1SCC303022M0201, ZTX series O&M, which is called out in some cases for further detail. This quick start guide is intended to...
  • Page 2 About your ZTX series ATS Zenith ZTX series construction Zenith ZTX series ATS consists primarily of the TruONE™ power panel and an electrical enclosure. The TruONELevel 2 power panel integrates switch, mechanism, controller, power supply, HMI, and all connectivity accessories into one seamless unit. The construction of this transfer switch is outlined in Figure 1.
  • Page 3 ATS, even without any line voltage or auxiliary power connected to the panel. This USB module plugs directly to the HMI. Download the Ekip Connect https://library.abb.com/en/ software and manual from the QR code or web address at the right.
  • Page 4: Auxiliary Contacts

    — Auxiliary contacts Auxiliary contacts will be shipped loose. Use Table 1 and Figure 3 to apply A (NO) and B (NC) contacts for correct operation. Each source has two separate mounting points capable of holding up to two aux contacts each for position indication, for a total of four per source.
  • Page 5 — Energizing For detailed instructions on installing your enclosed ATS and installing accessories, see sections 9 and 10 of the ZTX O&M manual. Before energizing the panel: 1. Confirm that installation has been performed by a qualified person and in accordance with NFPA 70 (NEC).
  • Page 6 Auto In-phase Priority Manual config monitor retransfer Start No priority Source 1 — ∆U 5% / ∆f 5% Dropout ∆U / ∆f ∆U 10% / ∆f 5% HMI keypad operation ∆U 15% / ∆f 10% ∆U 20% / ∆f 10% Generator stop delay S1 Failure...
  • Page 7: Auto Configure

    — Auto Configure Auto configure is the first step to take after the panel is initially energized. This function recognizes the electrical system, then automatically sets all the system parameters: system voltage, frequency, and phase sequence. 5 flashes in 1 s 5 flashes in 1 s Complete...
  • Page 8 — Settings (Optional) Default settings on the ATS are as shown in Figure 6. To alter settings, simply adjust the position of the dip switches accordingly. Generator exercisers must be programmed through Ekip Connect 3 with Ekip Programming module LOAD AUTO Auto In-phase...
  • Page 9 — Confirm Automatic Operation To put your ATS into Auto mode, confirm the slide switch is in “AUTO” before the enclosure door is closed. This slide switch overrides the Auto/Manual mode set from the HMI. To place ATS controller in auto mode, press the auto key on the HMI as in Figure 7.
  • Page 10 Auto In-phase Priority Manual config monitor retransfer Start No priority Source 1 — ∆U 5% / ∆f 5% Dropout ∆U / ∆f ∆U 10% / ∆f 5% Test ∆U 15% / ∆f 10% ∆U 20% / ∆f 10% Generator stop delay S1 Failure S1 Return delay [s]...
  • Page 11: Additional Information

    — Additional information — Manual and automatic operation - TruONE ATS Video https://www.youtube.com/watch?v=bosvSPVi2sM Installation of accessories - TruONE ATS Video https://www.youtube.com/watch?v=qV2KoIv38GY...
  • Page 12 — ABB Zenith Controls, Inc. 305 Gregson Drive Cary, NC 27511 24-hour support: ABB Technical Services +1 (800) 637-1738 epis.pqservice@abb.com http://solutions.abb/zenith © Copyright 2019 ABB. All rights reserved. Specifications subject to change without notice.