Download Print this page

Huawei OptiX RTN 320 Quick Installation Manual page 15

Advertisement

Installation Reference
Installing a Ground Cable
Ground screw
Scratch off the antirust paint and other coatings at the ground point
on the ground bar. After connecting the ground cable to the ground
point, treat the ground point with antirust and waterproof materials.
Connected to a ground bar
Opening the Maintenance Compartment
Loose the screw of the maintenance compartment.
1
Ensure that the OT terminal is correctly installed.
Install the device-side ground cable
before you climb up the tower.
90°
Installing an IF Cable
IF1
Lift the cover of the maintenance compartment.
2
14
• Do not remove or insert an IF cable connector from
or to the OAU 2A with power on. Otherwise, human
injuries may be caused.
• Do not power on the OAU 2A until IF cables are
properly connected.
For the method of making and laying out an IF cable,
see the RTN XMC ODU Quick Installation Guide.
Connected to an XMC ODU
Rotate the screw with a torque less than 1 N.m.

Advertisement

loading

This manual is also suitable for:

Optix oau 2a