Sharp VH-25 Series Operator's Manual page 15

Hide thumbs Also See for VH-25 Series:
Table of Contents

Advertisement

a. Please refer to Step a to e on motor dismantling.
b. Pull out drawbar ( 1 ) .
c. Take off three concave hexagonal bolts ( 1 ) and use two of them to push up the bearing
cover ( K ).
d. Take down the two concave hexagonal bolts ( L ) setting the pressboards from the top
and take out the bolt housing ( M ).
e. Take off the six concave hexagonal bolts ( N ).
f.
Use a soft mallet to hit the belt housing ( Q ) lightly upward so as to disengage it from
the gear hoursing ( P ).
g. Reverse the order of dismantling to restore the assembly once the speed change belt is
replaced.
Note : Replacing speed change belt shall conform to that of our company specifications.
OPERATOR'S MANUAL
P 12 / 57

Advertisement

Table of Contents
loading

Table of Contents