Huawei FusionModule 1000A20 Initial Configuration Parameter Manual page 13

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule 1000A20:

Advertisement

Bypass Param.
Maximum bypass voltage
Dry Contacts
Battery Param.
PDU Parameters-Branch breaker open alarm enable
PDU Parameters-Branch breaker open alarm enable
Settings
PDU Parameters-Branch breaker open alarm enable
PDU Parameters-Main input 3-phase cur. Imb
voltage level is 208 V
voltage level is 220 V
voltage level is 230 V
BCB connection
Batter breaker
Installation time
+15%
+10%, +15%, +20%, +25%
+15%
+10%, +15%, +20%
+10%
+10%, +15%
Disable
Disable/Enable
Disable
Disable/Enable
N/A
N/A
Enable
Disable/Enable/User-defined
Enable
Disable/Enable/User-defined
Enable
Disable/Enable/User-defined
Enable
Disable/Enable/User-defined
Default value
Default value
Default value
Disable
Disable
Set by service personnel
User-defined (After setting the parameter to User-defined,
disable the spare branch circuit breaker in the Installation
time PDU > Branch Battery conceptual diagram and enable
the branch circuit breaker that connects to a load.)
User-defined (After setting the parameter to User-defined,
disable the spare branch circuit breaker in the Installation
time PDU > Branch Battery conceptual diagram and enable
the branch circuit breaker that connects to a load.)
User-defined (After setting the parameter to User-defined,
disable the spare branch circuit breaker in the Installation
time PDU > Branch Battery conceptual diagram and enable
the branch circuit breaker that connects to a load.)
Disable