Wall-Mounted Installation - Huawei SUN2000-2KTL-L1 User Manual

Hide thumbs Also See for SUN2000-2KTL-L1:
Table of Contents

Advertisement

SUN2000-(2KTL-6KTL)-L1
User Manual

4.5.1 Wall-Mounted Installation

Procedure
Step 1 Determine the positions for drilling holes using the marking-off template. Level
the positions of mounting holes using a level, and mark the positions with a
marker.
Step 2 Secure the mounting bracket.
When drilling holes, avoid the water pipes and power cables buried in the wall.
Figure 4-8 Expansion bolt composition
(1) Bolt
(4) Flat washer
● To prevent dust inhalation or contact with eyes, wear safety goggles and an
● Wipe away any dust in or around the holes and measure the hole distances. If
● Level the head of the expansion sleeve with the concrete wall after removing
● Loosen the nut, spring washer, and flat washer of the expansion bolt at the
Issue 04 (2021-04-01)
D ANGER
NO TE
M6x60 expansion bolts are delivered with the SUN2000. If the length and amount of the
bolts do not meet installation requirements, prepare M6 stainless steel expansion bolts by
yourself.
NO TICE
anti-dust mask when drilling holes.
the holes are inaccurately positioned, drill holes again.
the nut, spring washer, and flat washer. Otherwise, the mounting bracket will
not be securely installed on the wall.
bottom.
Copyright © Huawei Technologies Co., Ltd.
(2) Nut
(5) Expansion sleeve
4 System Installation
(3) Spring washer
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents