Chapter 4 Procedures Before Operation - Mitsubishi Electric MELSEC iQ-R Series User Manual

Gp-ib interface module
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting a module
Mount the GP-IB interface module in any desired configuration.
Page 24 SYSTEM CONFIGURATION
2.
Wiring
Wire the GP-IB interface module to external devices.
Page 27 External Wiring
3.
Adding a module
Add the GP-IB interface module to a module configuration by using the engineering tool. For details, refer to the following.
 GX Works3 Operating Manual
4.
Parameter settings
Set up the parameters of the GP-IB interface module by using the engineering tool. For details, refer to the following.
 MELSEC iQ-R GP-IB Interface Module User's Manual (Application)
5.
Programming
Create programs. For details, refer to the following.
Page 28 COMMUNICATION EXAMPLES
4 PROCEDURES BEFORE OPERATION
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-rj71gb91

Table of Contents