Download Print this page

Sealey SSCL1 V2 Manual page 5

Platform scaffold stand
Hide thumbs Also See for SSCL1 V2:

Advertisement

9.2.
Place horizontal brace C on the first rung and lock in position.
9.3.
Take 2 of the 6 rung end frames, F and 3 diagonals B. Position a diagonal on the topmost rung of one frame and the second
diagonal on the same frame on the second rung on the other side. The last diagonal is to be placed on the top rung of the second end
frame.
WARNING: Make sure that everything is the right way round as per the sketch!
9.4.
Before climbing within the frame, lock the wheels.
9.5.
Position the end frames on to the folding base and lock the lower diagonal B to the 5th rung of the base frame. Make sure that the
butterfly locking part is completely rotated to hold the diagonal firmly in position. Put the 4 locking pins in place.
9.6.
Position the 4 stabiliser legs G as per the heights indicated on the sketch. Tighten firmly at the correct angle as shown above.
NOTE: Not all stabiliser legs are illustrated.
9.7.
Position platform H on the 5th rung from the bottom.
9.8.
Climb through the trapdoor, sit on the edge and position the two horizontal braces C on the 7th rung from the bottom and the 2 braces
C on the 9th rung. Lock the snap locks firmly in position.
9.9.
Stand up on the platform and fix the 2 diagonals B hanging from the frames into position.
9.10.
Take 2 of the 6 rung end frames, F and 3 diagonals B. Position a diagonal on the 4th rung of each frame but on opposite sides.
WARNING : Make sure that everything is the right way round as per the sketch!
9.11.
Position the end frames on to frame below and fix the 2 diagonals B hanging from the frames into position. Make sure that the
butterfly locking part is completely rotated to hold the diagonal firmly in position. Insert the frame locking pins.
9.12.
Position a platform H on the 11th rung and lock in place.
9.13.
Climb through the trapdoor, sit on the edge and position the two horizontal braces C on the 13th rung from the bottom and the 2
braces C on the 15th rung. Lock the snap locks firmly in position.
9.14.
Attach a diagonal B onto the lower rung of one of the two-rung guardrail end frames D.
9.15.
Position the first two-rung guardrail end frame D (without the diagonal) on the base and then put the two-rung guardrail end frame D
already equipped with the diagonal on the other side of the base. Fix the diagonal in place on the 17th rung. Make sure that the butterfly
locking part is completely rotated to hold the diagonal firmly in position. Insert the frame locking pins.
9.16.
Climb down to the lowest platform and sitting in the access hatch remove the 4 horizontal braces from rungs 7 and 9 and pass them to
the ground.
9.17.
Climb to the ground and remove the lower platform.
9.18.
Ascend to the platform on rung 11 and reposition the other platform on the 18th rung from the bottom. Lock the wind locks securely.
9.19.
Climb through the trapdoor, sit on the edge and position the two lower horizontal braces C on the 2nd rung from the top. Lock the
snap locks firmly in position . Remaining seated in the same position, put the other two rails C into position on the top-most rungs. Lock
the snap locks firmly into position.
9.20.
Lastly install the toe boards E.
9.21.
Lock all wheels prior to using the scaffold; ensure that the stabiliser legs are secure and firmly seated on the ground.
10. MAINTENANCE
10.1.
Keep all of the equipment clean and inspect before EVERY use for damage. Remove from service if damaged in any way.
10.2.
Lubricate all moving parts: castors, adjustable legs, stabiliser clamps, lightly with oil.
SSCL1 + SSCL3
.
© Jack Sealey Limited
SSCL1 + SSCL3 +
SSCL4
Original Language Version
SSCL1.V2, SSCL3, SSCL4 | Issue:3 (3) 12/11/19

Advertisement

loading

This manual is also suitable for:

Sscl3Sscl4Sscl1.v25024209628440