Download Print this page

Sealey SSCL1 V2 Manual page 4

Platform scaffold stand
Hide thumbs Also See for SSCL1 V2:

Advertisement

8. SSCL4 CONTENTS
9. ASSEMBLY
NOTE: The mobile scaffold tower may only be assembled, used and dismantled by persons familiar with these Assembly and Use
Instructions.
NOTE: These instructions show the assembly of SSCL1 + SSCL3 + SSCL4 from scratch. If you already have SSCL1 + SSCL3
assembled it will be necessary to partly disassemble some of the upper parts so that it resembles diagram No.8 in the diagram on the last
page. The parts removed will be reused in the assembly of the extended tower.
9.1.
Open folding base A and insert the locking pin in the centre of the folding section. Place diagonal B on one side on the first rung and on
the 4th rung on the other side. Make sure that the butterfly locking part is completely rotated to hold the diagonal firmly in position.
© Jack Sealey Limited
Original Language Version
SSCL1.V2, SSCL3, SSCL4 | Issue:3 (3) 12/11/19

Advertisement

loading

This manual is also suitable for:

Sscl3Sscl4Sscl1.v25024209628440