Download Print this page
Adey MagnaCleanse User Manual
Hide thumbs Also See for MagnaCleanse:

Advertisement

Quick Links

Advanced Central Heating System Flushing
User Guide for Open Vented Systems

Advertisement

loading
Need help?

Need help?

Do you have a question about the MagnaCleanse and is the answer not in the manual?

Questions and answers

Summary of Contents for Adey MagnaCleanse

  • Page 1 Advanced Central Heating System Flushing User Guide for Open Vented Systems...
  • Page 3 Monitor the MagnaCleanse system throughout operation. Check jubilee clips are secure before and during operation. For the most up to date version of the MagnaCleanse User Guide visit adey. com. Warranty Terms & Conditions can be found at adey.com Clean...
  • Page 4 Product Overview MagnaCleanse delivers a fast and effective flushing process for central heating systems. The process involves ADEY’s proven and award-winning MagnaClean technology. You will need: MagnaCleanse system contents, including: • MagnaCleanse RapidFlush filter • VibraClean radiator agitator ® •...
  • Page 5 N.B. Refer to MagnaClean installation instructions. Having completed the installation of the MagnaClean filter, remove it and attach the MagnaCleanse hoses between the RapidFlush filter and the MagnaCleanse HTV connector attached to the isolation valve on the pipework using the appropriate adaptor.
  • Page 6 Leave the furthest radiator open. With the system running, using ADEY’s VibraClean tool attached to an SDS drill, set to hammer only mode with no rotary action and agitate radiator for 15-20 seconds.
  • Page 7 Remember to double check valve, pressure reducing valve and gauge. Isolate electrics to the boiler and set the boiler control to OFF. Attach a drain hose to the MagnaCleanse drain valve and secure with a jubilee clip. When cold, temporarily cap off the expansion pipe.
  • Page 8 Step-by-step Turn OFF the HTV isolation valve 2. Open the heating circuit only (two or three port valve) leaving the cylinder flow closed. Check all radiators and bypass are turned off, leaving the furthest radiator from the boiler open. Turn on the cold mains supply and allow the mains water to flush through the pipework, partially filled radiator and return.
  • Page 9 Top up the system allowing the header tank to fill to the required level. Once complete, remove drained MagnaCleanse assembly, disconnect and reinstall MagnaClean filter to the isolation valves. If this method is not appropriate ensure a full drain down is carried out.
  • Page 10 Commission the system following the manufacturer’s instructions. Before leaving the property, carry out the last job – service Magnaclean filter ensuring a final check is carried out for leaks. Remember to monitor the MagnaCleanse system throughout operation.
  • Page 12 For the most up-to-date version of installation and serving instructions visit www.adey.com All ADEY marks are trademarks of Adey Holdings (2008) Limited. Please visit adey.com/trademarks for a list of ADEY marks Copyright Adey Holdings (2008) Limited © 2019. All rights reserved.