Huawei ATOM GPS Quick Installation Manual page 6

Table of Contents

Advertisement

Introduction to the ATN ATOM GPS
a
NE05E-SJ
Power supply
interface
Optical interface
b
AE 905S
Loosen the ejector lever.
NOTE
Before inserting an AE 905S to an optical interface, lock the ejector lever. Before
removing an AE 905S from an optical interface, loosen the ejector lever.
An AE 905S module can be installed in any GE optical interface. Installing an AE
905S module on an FE/GE2 interface is recommended to reduce reliability risks
caused by cable bending.
NM interface
(Console interface)
Electrical interface
Lock the ejector lever.
NOTE
FE/GE4 and FE/GE5 are Combo interfaces and either of
them includes one SFP interface and one electrical
interface. The SFP and electrical interfaces cannot be
used at the same time.
3 3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ne05eAe 905s

Table of Contents