The STS insulation tests cover the transformer MV side, ring main unit, transformer LV side,
bus on the LV side, and auxiliary loop. For details, see the STS-(3000K, 6000K)-H1 Smart
Transformer Station User Manual.
Perform the insulation tests before connecting incoming cables and sealing cable holes.
Issue 02 (2020-02-21)
6
Copyright © Huawei Technologies Co., Ltd.

STS Insulation Tests

6 STS Insulation Tests
40