Hoisting Verification; Securing A Container - Huawei STS-6000K-H1 Installation Manual

Smart transformer station
Hide thumbs Also See for STS-6000K-H1:
Table of Contents

Advertisement

STS-6000K-H1 Smart Transformer Station (Vietnam,
Duc Long Gai Lai)
Installation Guide
Figure 3-2 Leveling the container
----End

3.4 Hoisting Verification

No.
1
2
3

3.5 Securing a Container

Step 1 Secure a container.
Issue 02 (2020-02-21)
Check Item
Deliverables
Container door
Container enclosure
There are four mounting holes where angle steel brackets contact the base. Mark all mounting holes.
Each angle steel bracket must be secured by two mounting holes. Preferentially drill the outer two
mounting holes. If steel bars in a concrete base block the drill bit, drill the inner mounting holes.
Ensure that the expansion bolts are tightened when securing the angle steel to the base.
Copyright © Huawei Technologies Co., Ltd.
Acceptance Criteria
Check whether the deliverables are complete, whether any
screw is loose, and whether there is any visible external
damage. If any component is missing, any screw is loose,
or any damage is found, contact your dealer.
NOTE
For details about the supplied number of accessories, see the
packing list.
The documents delivered with the product are important and
should be kept properly.
All container doors can be smoothly opened and closed.
The container enclosure is not deformed or cracked.
3 Equipment Installation
23