Commissioning and configuring
6.4 Load the configuration into the control system
6.4
Load the configuration into the control system
6.4.1
Load the configuration to the PLC
Description
The project must be stored and compiled before the system data is created for the PLC and the
complete configuration can be closed.
Preconditions
● The hardware configuration is compiled (Page 45).
● A communication connection (Page 45) exists between the PG/PC (TIA Portal) and the
SINUMERIK MC.
242
Safety Integrated (with SINAMICS S120)
Commissioning Manual, 02/2020, A5E46305916B AB