Connecting the Water Supply and Return Pipes of the Water Cooling Module
Connecting the steel pipe
(1) Reserved device port
(2) Steel pipe
8.4
Performing a Leakage Test with Water for the Water Cooling Module
Manually open the water valve. Inject water to 0.8
MPa and preserve the pressure for 24 hours.
Connect the pressure gauge to the cooling water
side needle valve and measure the pressure
gauge reading. If the reading remains unchanged,
the pipe is not leaking. You can perform the
following operations.
9
Installing Cables
1. The power cables and signal cables should be tied and cased separately.
2. The shielding layer of signal cable must be grounded.
3. In underfloor cabling, if it is hard to bend the cable 90°, disassemble the cable and fix it using
the pipe clamp. As the PE cable is long, prepare the five-core cable based on the length of the
PE cable.
4. The recommended upstream switch is C63 or higher.
5. The outdoor unit, indoor unit and Water Cooling Module must receive power from the indoor
unit.
(1) Refrigerant side needle valve
(2) Cooling water side needle valve