Download Print this page

Huawei PowerCube 500 V200R001C10 Quick Manual page 2

Hide thumbs Also See for PowerCube 500 V200R001C10:

Advertisement

2
Tools
3
Routing Cables Through the Pole
1. Place the pole on a wooden case or a similar object.
2. Route a pull wire.
3. Route cables.
Routing Cables Through the Solar Hybrid Pole
Module
Mains AC
ground cable
cable and
optical fiber
Routing Cables Through the Cantilever
Mains AC cable, module
ground cable, optical
fiber, camera cable, CPE
cable, and PV cable
Camera
ground cable
Bullet camera signal
cable, power cable,
and ground cable
2
CPE cable
Dome camera signal cable,
power cable, alarm cable,
and ground cable
CPE cables can be used only in scenarios
where CPE is adopted.
The cables routed from the pole cable hole
have a length of 1.5 m reserved. The
cables routed from the cantilever cable hole
have a length of 0.5 m reserved.
The object where the pole is placed should
be able to bear a load above 700 kg.
PV DC input cable
Camera signal
cable, power
cable, and
alarm cable

Advertisement

loading

This manual is also suitable for:

Cps300-n18a1h1