Installing the Assemblies
1
Installing the NE Equipment in the APM30H Cabinet
a
Fixing the Floating Nuts
Floating nut
Installation hole
b
Installing the NE Equipment
1U-height chassis
NOTE
Remove the guide rail, if any, in the installation position.
Use a marker to mark the location
where a floating nut is required. Ensure
that floating nuts are installed on the
right locations. Four floating nuts are
fixed on the two sides of a rack.
2U-height chassis
8