Download Print this page

Toro 08860 Installation Instructions

Discharge chute kit for sand pro, grounds pro and groundsmaster debris blowers

Advertisement

Quick Links

Discharge Chute Kit
For Sand Pro, Grounds Pro and Groundsmaster Debris
Blowers
Model No. 08860
Note: If front discharge is desired, an optional Chute,
Toro Part No. 104–0329–01, is available.
1. Remove screws and washers securing deflector to
blower discharge opening (Fig. 1). Remove deflector
and retain for future installation.
1
2
Sand Pro Debris Blower Shown
Figure 1
1. Discharge opening
deflector
2. Mount pivot assembly to top of chute assembly with
(5) 3/8116 x 7/8" lg. carriage bolts, .406 x .813 flat
washers and 3/8–16 locknuts (Fig. 2).
Note: Chute assembly can be rotated 180 degrees for right
or left discharge on debris blower.
Figure 2
1. Pivot assembly
W 2008 by The Toro Company
8111 Lyndale Avenue South
Bloomington, MN 55420-1196
2. Deflector mounting screws
1
2
2. Chute assembly
Installation Instructions
3. Using (2) 3/8–16 x 7/8" carriage bolts, .406 x .813 flat
washers and 3/8–16 locknuts, mount a cover plate and
spring mount bracket to slot in front of blower
discharge chute (Fig. 3).
4. Using (2) 3/8–16 x 7/8" carriage bolts, .406 x .813 flat
washers and 3/8–16 locknuts, mount a cover plate to
slot in rear of blower discharge chute (Fig. 3).
Back
1
1
Figure 3
1. Cover plate
5. Mount a eye bolt to side of chute assembly with (2)
washers and jam nuts. Position eye bolt as shown in
(Fig. 4).
Figure 4
1. Eye bolt
6. Mount the deflector to chute assembly with screws and
washers previously removed (Fig. 5).
1
Form No. 3324–993 Rev. A
2
Front
2. Spring mount bracket
1
All Rights Reserved
Printed in the USA

Advertisement

loading

Summary of Contents for Toro 08860

  • Page 1 Note: If front discharge is desired, an optional Chute, 3. Using (2) 3/8–16 x 7/8” carriage bolts, .406 x .813 flat Toro Part No. 104–0329–01, is available. washers and 3/8–16 locknuts, mount a cover plate and spring mount bracket to slot in front of blower 1.
  • Page 2 10. Slide handle tube into handle support and loosely secure with (2) U–bolts, washers and nut (Fig. 8). Figure 5 1. Deflector 7. Mount chute assembly to discharge opening with a pivot rod, (2) flat washers and cotter pins. Position Figure 8 components as shown in figure 6.