Summary of Contents for Elite Greenhouses 6'3" WIDE HIGH EAVE
Page 4
PARTS LIST 4 x 6 6 x 6 8 x 6 10 x 6 12 x 6 Nuts and bolts M6 Band clips Wire clips Overlap clips Casement stay Stay pins Pins, nuts and bolts M4 Door lock and fittings Short self tapping screw Long self tapping screw Spring washer...
Page 5
HELPFUL HINTS Please do take your time and be sure to read all instructions carefully before assembling. Consider purchasing the Elite Construction pack to help with the installation – contact dealer for details. Do not assemble frame in high winds. ...
Page 6
INSTALLATION INSTRUCTIONS FOR THE 6’3” WIDE MODEL “HIGH EAVE” RANGE” THE CONTENTS OF THIS CARTON ARE DIVIDED INTO DIFFERENT FRAME AS- SEMBLIES THAT COLLECTIVELY MAKE UP THE COMPLETED GREENHOUSE FRAMEWORK. It is recommended that each framework assembly is fully completed before moving onto the next. The contents are as follows: 1.
Page 7
SIDE FRAME ASSEMBLY When you come to the greenhouse itself start by assembling the side frames first. The base is integrated with the cill for each side of the greenhouse, and is assembled onto each subassembly rather than separately laid out. Lay out the pieces on the ground as though you were standing inside the house, i.e.
Page 8
SIDE FRAME COMPONENTS LIST 1 Gutter/eave bar 1 Built in base Glazing bars—1 if 4’ long Angle tie bar—1 if 4’ long 2 if 6’ long 2 if 6’, 8’, 10’ or 12’ long 3 if 8’ long 4 if 10’ long 5 if 12’...
Page 9
REAR END ASSEMBLY Components Built in base Cill “marked rear end” Glazing bars 2 Roof Corner Bars (marked “R” at the apex) 2 Side Corner Bars 2 Diagonal cross ties 1 Horizontal brace From the main bag of fittings you will require the nuts and bolts. You will also require 2 eave plates and 1 ridge plate.
Page 10
Check that all angles between the built in base and the vertical members are at right angles and that the glazing bars are right into the angle cill at the bottom. (Key point). Tighten all nuts. Slide a bolt into the bolt slot in the built in base section, one at each end. The corner bracket is approx 400mm long and has 6 holes (4 at 1 end and 2 at the other).
Page 12
DOOR END ASSEMBLY Components 1 Door end cill 2 Built in base cill 2 End glazing bars (longer than rear end glazing bars) 2 Rectangular plates with 3 slotted holes 2 Short horizontal braces 2 Roof corner bars (marked ‘R’) 2 Side corner bars (unmarked) 1 Door track support 1 Top door track...
Page 13
Remember, the door end glazing bars are 95 mm longer than the rear end ones and do not sit on top of the base (as the rear end glazing bars do), they go down the side of the base and attached to the bottom cill. (Key point) Attach the rectangular plate (with 3 holes) to the 2 bolts inserted in the glazing bars and the last bolt inserted into the base ensuring that the glazing bar is tight down into the angle of the door end cill.
Page 14
DOOR END ASSEMBLY At a later stage, when the top door track has been attached, the precise height and position of the track and support can be established.
Page 15
SINGLE DOOR FRAME ASSEMBLY Components consist of: 2 door glazing bars 3 infill panels (1 with oval hole for lock barrel) 2 top and bottom door panels From the main bag of fittings you require 2 door wheels 1 clip on nylon door skid (this might already be clipped to the bottom door panel) 2 lengths of black brush draft excluder inserted into a pvc extrusion Door Lock, cam and pin...
Page 16
FITTING THE DOOR HANDLES The handle is fitted to the infill panel on the door (choose between 1st or 2nd panel down). Position the handle centrally, and mark the hole position. Drill 7mm diameter holes (2 holes per door), then fit the handle, and secure with a nut and bolt.
Page 17
FITTING THE DOOR LOCK The door lock must be fitted after the door is in position (Key Point). Undo the ring bolt from the door lock, and insert the barrel through the hole in the panel from the outside. Reattach the ring bolt to the barrel on the inside, and tighten.
Page 18
FINISHING OFF To prevent the door from sliding past its opening, you must fix 2 angle brackets to the door end as- sembly. Insert a cropped head bolt into the bolt channel at the top of the left hand glazing bar (viewed from the inside) and fix and angle bracket as shown in the picture below.
Page 19
ROOF VENT ASSEMBLY The roof vent pack has 5 pieces of aluminium: and from the main box of fittings you require: 6’ of glazing beading 4 nuts and bolts 2 casement stay pins 1 casement stay 6 M4 stainless steel nuts and bolts. PROCEDURE: Identify the slam bar and attach the 2 stay pins to the outer side of the angle using the M4 stainless steel nuts and bolts.
Page 21
ASSEMBLY OF GREENHOUSE UNIT The first operation is to connect the two side frames to the end frames to form the outer shape of the completed structure. Another pair of willing hands would be useful at this stage. Lift the first side frame into its position by the rear end. Slot the eaves bar into the small space between the roof and side corner bar so that the gutter is outside the end frame and the two flanges that form the angle of the roof and side are inside and tight up against the bolt slots of the roof and side corner bar.
Page 22
Slide the glazing beading into the V groove of the roof glazing bars. They can now be attached to the ridge and gutter. Attach them to the ridge first by sliding a bolt into the bolt slot of the glazing bar, inserting it through the hole in the flange of the ridge. Put a nut on and tighten up.
Page 23
The greenhouse is now ready for lifting on to its permanent base. If you are fitting the greenhouse onto soft ground, you now need to dig 1 hole (approx 1 spade width) in each of the 4 corners. Lift the greenhouse into position. For soft ground fixing, you now need to attach the cor- ner bracket (base anchor) to the bolt slot of the side and end using the end of the bracket that has 2 holes as oppose to 4.
Page 24
FITTING THE RAMP The final aluminium piece of the greenhouse is the door end ramp cill. The ramp is at- tached to the door end cill by engaging the nub of the door end cill to the ‘C’ groove of the ramp.
Page 25
PARTITION If you have purchased a partition it is at this point that you construct the frame in situ. In the box you will find packs marked Partition corner bars Partition door end cill Partition door end Partition door track Partition door panels Partition door posts You will also require a number of fittings from the box...
Page 26
Now attach the aluminium base to the 2 side base sections of the greenhouse. Firstly bolt an anchor bracket on each end of the partition base. If you are on flags or concrete cut off the surplus metal of the corner bracket. Position the base under the partition cill and attach it to the side base walls by inserting a bolt into each bolt slot of the side base.
Page 27
GLAZING THE STRUCTURE Always handle glass with extreme care as failure to do so can result in injury HORTICULTURAL AND MULTI-SHEET TOUGHENED GLASS 1. Starting with the bottom pane of one side, offer the pane to the glazing bars. Hold it in place by inserting two of the stainless steel clips six inches from the bottom of the glass.
Page 28
HIGH EAVE HORTICULTURAL GLASS & MULTI-SHEET TOUGHENED GLASS GLASS APPLICATION: Louvre glass: 5 @ 573 x 100 x 4mm (Louvre must be sandwiched between two panes of glass) Glass under louvre: 1 @ 610 x 140mm LENGTH A (610 X 610mm) B (610 X 457mm) 4’5”...
Page 29
FULL SHEET TOUGHENED GLASS (EN12150 If you have purchased bar capping as an optional extra, see separate instructions with the capping for fitting instructions. A wire clip is used when bar capping is fitted and these clips will be found inside the bar capping box.
Page 30
HIGH EAVE TOUGHENED GLASS The quantities in the table below are for a greenhouse with standard specification. These figures may change with the addition of extra roof vents and louvres LOUVRE WINDOW Situated at side or rear centre = 1) Less 1 off ref 8 2) Plus 1 off ref ‘10’...
Need help?
Do you have a question about the 6'3" WIDE HIGH EAVE and is the answer not in the manual?
Questions and answers