PARTS LIST 4 X 2 6 X 2 8 X 2 10 X 2 50’ Glazing beading 100’ Glazing beading Eave gusset plate Black draught excluder Top door panel Taped together and marked door Bottom door panel Door infill panels Door track support Ridge Taped together in...
HELPFUL HINTS Please do take your time and be sure to read all instructions carefully before assembling. Do not assemble frame in high winds. The greenhouse frame should be anchored to a permanent foundation. This will not only help secure it against powerful winds, but will help prevent breakage of the glass caused by the freezing and thawing process of the earth.
PRE-ASSEMBLY Building regulations may be required for this greenhouse. Because local building codes vary, be sure to check before setting up the greenhouse. In deciding the location of the greenhouse, consider the following: Make sure that you do not locate the greenhouse beneath a tree where branches could fall and dam- age it.
Page 7
Use hand shears rather then a powered string trimmer when trimming glass around the base of the greenhouse. Make sure that the catch at the top of the door is latched when no one is in the green house. Do not latch the door when anyone is inside the greenhouse. Be aware of the increased temperature inside the greenhouse on a sunny day and equip the greenhouse with a thermometer.
Page 8
The contents are as follows: 1. Left hand gable 2. Right hand gable 3. Front 4. Door(s) (4’ + 6’ = single, 8’ = double and 10’ = 2 x single) 5. Roof 6. Roof vents 7. Bag of fittings 8.
Page 9
ELITE GREENHOUSES BASE DIMENSION For brick, block, concrete and timber The dimensions given below must be used to locate the position of your lean-to-greenhouse or to lay corner footings if they are needed. If a brick, concrete or timber base is to be laid, construct it as shown ensuring that dimensions A &...
Page 10
ALLOY BASE ASSEMBLY For brick base see page 9. 4’ model = 1 at 1.258m + 2 at 0.640m + 2 base legs 6’ model = 1 at 1.880m + 2 at 0.640m + 2 base legs 8’ model = 1 at 2.504m + 2 at 0.640m + 2 base legs 10’...
Page 11
If you have bought an alloy base to go with the house, start with this. Lay the three base sections on level ground in a rectangle with the bolt channels facing inward and the flanges facing outwards, remembering to put the wider of the two flanges towards the floor.
Page 12
RIGHT HAND GABLE (When viewed from inside) In the pack marked “right hand gable” there are five pieces of alloy. Roof corner bar Side corner bar Wall bar Bottom cill Bracing angle From the main box and bag of fittings you also require: Nuts and bolts, 12 in total One eave gusset plate...
Page 13
PROCEDURE Insert the glazing beading into the two corner bars and wall bar. N.B. Do not put any beading in the middle groove of the corner bar. (Key point). Lay the 5 parts out on a flat surface with the inside of each bar facing upwards, i.e. with the cill facing downwards and bolt slots of two corner bars facing inwards.
Page 14
FRONT FRAME Parts required: 4’ x 2’ 6’ x 2’ 8’ x 2’ 10’ x 2’ Eave/gutter bar Cill Glazing bars Angles Flat bars You will require from the main box and bag of fittings: Nuts and bolts Glazing beading 4’...
Page 15
PROCEDURE Lay out the component parts on a flat surface, with the inside of the bars uppermost, the gutter and cill are facing the ground. (Key point). Thread the glazing beading into the glazing bars and the gutter. It is not required on the inside groove where a door will be situated.
Page 17
DOOR FRAME ASSEMBLY From the main bag of fittings you require: 2 door wheels Components consist of: 1 clip on nylon door skid (this might already be fitted 2 door glazing bars prior to delivery 2 infill panels 2 lengths of black brush draught excluders 2 top &...
Page 18
DOUBLE DOOR FRAME ASSEMBLY Each door component consists of: 2 door glazing bars 1 = handed, 1 = unhanded 2 infill panels 1 top and 1 bottom door panels From the main bag of fittings you require 2 door wheels 1 clip on nylon door skid (this may already be fitted prior to delivery 1 length of black brush draught excluder...
Page 19
10. Do not fit the doors to the front at this stage; wait until the structure is fully assembled prior to glazing. 11. The double door catch is fitted to the door panels as illustrated (this replaces the single door catch).
Page 20
ROOF VENT ASSEMBLY In the pack marked “Roof Vent” there are five pieces of aluminium Vent hinge Vent cill Vent slam bar 2 vent glazing bars From the main box and bag of fittings you will require: 1. 6’ glazing beading 2.
Page 21
ASSEMBLY OF GREENHOUSE UNIT The five frames are now completed and ready for assembling into the completed unit. Please follow the next steps carefully and observe all safety precautions. An extra pair of willing hands would be useful at this stage.
Page 22
A. Attach Right and Left hand gables to Front Frame Stand the right hand end frame and the front frame up so that they meet at the right front corner. Push the gutter/eave bar into the small gap between the roof and side corner bars so that the slotted holes at the end of the eave flanges line up with the bolt slot in the corner bar.
Page 23
Sliding the vent into position The hinge is a groove ‘C’ joint, one ‘C’ is an integral part of the ridge, the other inverted ‘C’ being a part of the vent top rail. (Key point). Firstly identify these two sections and then slide the vent onto the ridge from one end. With the vent in the open position, push the vent along the ridge until it covers the section where the vent is to be situated.
Page 24
The frame assemblies and final unit shape are now complete, but there are three further steps to take: Securing to the wall and base Fitting the door Glazing the completed structure Securing to the wall and base Offer the structure to the wall that it is to abut, ensuring that the verticals are plumb, and that the building is square and at 90º...
Page 25
A Alloy base Having assembled the base as previously described on page 10, place the greenhouse on top of the upper base flange, i.e. smaller of the two flanges. Position the greenhouse so that the back vertical edge of the cill is level with the vertical side of the base.
Page 26
Fitting the door track support/door track For the 6’ x 2’ install the door track support onto the upper part of the two middle front bars, for 4’ x 2’ utilise the one middle bar and one of the side corner bars using the bolts inserted into the front bars previously (page 15 para 3).
Page 27
The door slides onto the frame from the left hand side. Put the door bottom rail into the bottom door track and slide to the right, feed the first wheel into the upper door track and move further to the right until the black draught excluder butts up to the door way glazing bars.
Page 28
GLAZING THE STRUCTURE BAR CAPPING If you have purchased bar capping you MUST NOT use the band clips, you use wire clips instead, see diagram. Please see separate instructions packed with the bar capping for how to install the capping. HORTICULTURAL AND MULIT SHEET TOUGHENED GLASS Always handle glass with extreme care as failure to do so can result in injury.
Page 30
HORTICULTURAL GLASS PLAN LENGTH WIDTH 4’ X 2’ 6’ X 2’ 8’ X 2’ 10’ X 2’ TOTAL...
Page 31
TOUGHENED GLASS PLAN CODE LENGTH WIDTH 1563 4’ X 2’ 6’ X 2’ 8’ X 2’ 10’ X 2’ TOTAL...
Need help?
Do you have a question about the 2'3'' Wide Easy Grow and is the answer not in the manual?
Questions and answers