Yamaha O2R96 Service Manual page 38

Digital mixing console/ peak meter bridge/wooden side panels
Hide thumbs Also See for O2R96:
Table of Contents

Advertisement

02R96
15.
DC Fan Motor
(Time required: About 20 minutes)
15-1. Remove the SP02R96. (See procedure 1.)
15-2. Remove the MB02R96. (See procedure 2.)
15-3. Fasten the control panel assembly. (See procedure 3.)
15-4. Fasten the rear assembly U. (See procedure 4.)
15-5. Remove the four (4) screws marked [140A]. The DC
fan motor, the four (4) fan vibration absorbing rubbers,
the fan guide, the fan guard and the four (4) toothed
lock washers can then be removed. (Fig.3)
When you install the DC fan motor, be sure to
attach the screw lock.
Fan vibration absorbing rubber
[140A] x 4
Fan guard
38
DC fan motor
Fan guide
[140A]:Bind Head Screw
[500]: Hex. Locking Screw
[520]: Bind Head Tapping Screw-B
[530]: Bonding Tapping Screw-B
<Top view>
<Rear view>
[140A]
4.0X40 MFZN2BL (VV413200)
JFS-2.6S-BIW (VS604900)
3.0X8 MFZN2BL (EP600190)
3.0X8 MFZN2BL (VN413300)
Fig.3
[520]
DA
JK2 (2/2)
[530]
[500]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mb02r96Sp02r96

Table of Contents