Finishing Commissioning; 6.12.1 Fitting The Front Panel; 6.12.2 Appliance/Product Guarantee - Bosch Worcester 2000 Series Installation And Maintenance Instructions Manual

Gas-fired condensing combi appliance
Table of Contents

Advertisement

Commissioning
6.12

Finishing commissioning

6.12.1 Fitting the front panel

▶ Fit the front panel making sure that the securing points are properly
located.
– Lift the front panel onto the locating bracket on the top of the
appliance.
– Push the bottom of the panel into position and tighten the bottom
two screws [1].
Fig. 59 Fitting the front panel
At the time of commissioning, complete all relevant sections of the
Benchmark Checklist located at the end of this chapter.
44
1
Appliance handover:
▶ Complete the Benchmark Gas Boiler Commissioning Checklist.
▶ Set up the appliance controls and show the customer how to operate
all the control unit/s for central heating operation.
– Also show where in the appliance/controls documentation where
this information can be found.
▶ Where applicable, instruct the customer on:
– how to check the system pressure and re-pressurise if necessary.
– how to set the TRVs.
– how to reset the appliance.
▶ Show the customer the fault finding section in the User Instructions.
▶ Show the customer where the serial number/appliance information is
located, they will need this information if they call in with a problem
(Benchmark Commissioning checklist on page 78 contains all
relevant appliance information).
▶ Give the customer details of how to contact the installer/ gas
emergency numbers.
▶ Show the customer how to safely isolate the appliance.
▶ Advise the customer where they can find information on the
Worcester, Bosch Group website www.worcester-bosch.co.uk.
▶ Ensure that all documentation, is left with the appliance or
homeowner.
– Appliance documentation.
– Controls documentation.
– Any other equipment documentation that is connected to the
appliance or system.
▶ Appliance not in use
– If the appliance is not going to be used immediately and may be
exposed to freezing conditions, advise the customer of the
precautions necessary to prevent damage to the appliance,
system and building.
– If the appliance is unused and exposed to freezing conditions,
safely isolate all the mains supplies and drain the system and
appliance, label accordingly.
▶ Show the customer the location of the condensate pipe run in
unheated or external areas that may be at risk of freezing during
prolonged cold spells.
▶ User recommendation: Arrange an inspection/maintenance
contract with an approved heating contractor.

6.12.2 Appliance/product guarantee

This appliance/product has a guarantee against faulty materials or
workmanship for a period from the date of installation subject to the
terms and conditions.
For full terms and conditions, please visit:
www.worcester-bosch.co.uk/guarantee-terms-and-conditions
Guarantee registration
Your appliance/product carries a guarantee against faulty material or
manufacture subject to Terms and Conditions.
To read the full Terms & Conditions please visit us on-line at
www.worcester-bosch.co.uk/guarantee.
Your statutory rights are not affected by the manufacturer's guarantee
Worcester 2000 – 6 721 814 551 (2019/09)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents