System Layouts Examples; System Fill - Bosch Worcester 2000 Series Installation And Maintenance Instructions Manual

Gas-fired condensing combi appliance
Table of Contents

Advertisement

Pre-Installation
T[°C]
90
80
70
60
50
A
40
30
0
100
200
300
Fig. 5
Curves for the expansion vessel
1
Pre-charge pressure 0.5 bar (minimum)
2
Pre-charge pressure 0.75 bar
3
Pre-charge pressure 1.0 bar
4
Pre-charge pressure 1.2 bar
5
Pre-charge pressure 1.3 bar
A
Operational capacity of the expansion vessel (left of the relevant
curve)
B
Additional expansion vessel required (right of the relevant curve)
T
Maximum operating temperature [ °C]
V
Total System Volume [l]
The default pre-charge pressure for the appliance is 0.75 bar
4.1.3

System layouts examples

Sealed primary system - Single central heating circuit:
Typical primary system example
1
Fig. 6
Single central heating circuit example
[1]
Appliance
12
B
5
4
3
2
1
400
500
600 700
V[l]
0010016558-002
Sealed primary system - 2 x central heating zones:
• Requirement for new builds if the floor area of a property is over
2
150m
.
2
1
Fig. 7
Separated heating zones
[1]
Appliance
[2]
Zone valves
4.1.4

System fill

Integral filling link
• An optional filling link accessory is available to fill the system.
– Refer to filling link instructions for fitting and operation.
Filling primary sealed systems
NOTICE:
Filling the primary sealed system
The system must not be filled with salt based softened water.
▶ Ensure the primary water filling point uses an untreated cold water
connection from the mains supply, before a water softener.
• Filling the system must comply with one of the following methods
shown.
• The filling point must be at low level and must never be a permanent
connection to the mains water supply.
• Filling loops must be WRAS approved.
• If the external filling link is sited away from the appliance, then a
pressure gauge should be installed at the filling point.
External filling loop
1
3
3
2
4
Fig. 8
External filling loop system fill example
[1]
Cold mains inlet pipe
[2]
Stop valve
[3]
Check valve
[4]
Test point
[5]
Hose union
[6]
Central heating flow pipe
Worcester 2000 – 6 721 814 551 (2019/09)
2
6
5
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents