Installation

11 Installation

11.1 Mechanical installation

®
The installation of the METPOINT
OCV and of the 3/8" ball valve is carried out in accordance with the
®
specifications in the separate instructions for the installation and operation of the METPOINT
OCV.
®
The sensor unit of the METPOINT
OCV must be fixed on the part of the customer.
The pressure reducer is firmly connected with the inlet into the sensor unit and is fixed in the factory
using a holding plate.
The connection between the pressure reducer and the ball valve can be flexibly designed. For this
purpose, the supplied stainless steel pipe 6 x 1 mm and fittings must be used.
The installation can be implemented by the customer, but we recommend having the device installed
and started up by our service crew.

11.2 Electrical installation / connection to the electric mains

®
The electrical installation of the METPOINT
OCV is carried out in accordance with the specifications
®
in the separate instructions for the installation and operation of the METPOINT
OCV.

12 Start-up

12.1 Initial start-up

Please proceed according to the description in the separate instructions for installation and operation in
®
order to start up the METPOINT
OCV.

12.2 Restart

®
When the METPOINT
OCV is started up after a long rest period, please proceed as if you were
starting up the device for the first time.
Check, above all after service measures or repair, whether or not the components are tubed
completely and electrically connected. If this is not the case, carry out the installation properly.
Check all of the pipe joints for tightness.