Figure 11-1 Resetting The Xtc Card; Chapter 11 Upgrade Card And Span - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

Chapter 11
Upgrade Cards and Spans

Figure 11-1 Resetting the XTC card

Physically replace the remaining XTC-14 card:
Step 5
Open the XTC-14 card ejector.
a.
Slide the card out of the slot. This raises an
b.
is complete.
Open the ejector on the XTC-28 card.
c.
Slide the XTC-28 card into the slot along the guide rails.
d.
Close the ejector and secure the screw.
e.
f.
The ONS 15327 boots up the second XTC-28 card. The second XTC-28 card must also copy the
database, which can take approximately 10 minutes. Do not remove the card from the shelf during
a database transfer.
If power-related alarms occur after the second XTC-28 card is installed, check the voltage on the
Step 6
backplane. See the
ONS 15327 Troubleshooting Guide for information on clearing alarms.
Stop. You have completed this procedure.
March 2003
"DLP-B33 Measure Voltage" task on page 1-49
NTP-B229 Upgrade the XTC-14 Card to XTC-28 Card
alarm that will clear when the upgrade
IMPROPRMVL
for instructions. Refer to the Cisco
Cisco ONS 15327 Procedure Guide, R4.0
11-3

Advertisement

Table of Contents
loading

Table of Contents