Unpacking The Switch - Dell Networking C9010 Getting Started Manual

Hide thumbs Also See for Networking C9010:
Table of Contents

Advertisement

Figure 1. C9010 Chassis — Installed Components with Slot Numbers

Unpacking the Switch

The switch and its accessories are shipped in a single box. The power cords may be shipped in a separate
box. Before unpacking the switch, inspect the container and immediately report any evidence of damage.
Verify that you have received your ordered items. If any item is missing or damaged, contact your Dell
Networking representative or reseller for assistance.
CAUTION: Always wear an ESD-preventive wrist or heel ground strap when handling the switch
and its components. Ground yourself by using an antistatic wrist strap or other device and
connect it to the ESD grounding jack on the chassis. As with all electrical devices of this type, take
all necessary safety precautions to prevent injury when installing this system.
CAUTION: The system is packaged in one or two separate containers. Use an equipment lift or
pallet jack to lift or install the chassis. Lifting the system by its shelves will cause damage to the
chassis.
Unpack the C9010 by carefully removing the device from the container and place it on a secure and
clean surface.
The base C9010 configuration package is shipped with:
C9010 chassis
One full-width Route Processor module (RPM)
Three fan trays
One AC power supply
C9010 Hardware Description
5

Advertisement

Table of Contents
loading

Table of Contents