Removal and reinstallation of the operation panel or the front covers....................................................................21
2.3
Installation of the inverter and enclosure design ....................................................................................................24
Main circuit terminals ..............................................................................................................................................38
2.6
Control circuit..........................................................................................................................................................44
2.7
Communication connectors and terminals..............................................................................................................61
2.8
Connection to a motor with encoder (Vector control) .............................................................................................64
2.9
Parameter settings for a motor with encoder..........................................................................................................70
2.10
Connection of stand-alone option units ..................................................................................................................71