Power Modules
4.2 Blocksize Power Modules (PM240-2)
4.2.6

Mounting

Fire hazard due to overheating because of inadequate ventilation clearances
Insufficient ventilation clearances lead to overheating with associated risk to persons as a
result of smoke and fire. This can also result in increased downtime and reduced service
lives for devices/systems.
• Always install the Power Modules vertical with the line and motor connections below.
• When mounting, maintain a 1 mm clearance between components.
• Ensure the following ventilation clearances above and below the component:
• Only install devices in this area that do not obstruct the flow of cooling air.
• Ensure that the cooling air can flow through the Power Modules unobstructed.
Note
Mounting instructions for
• You must mount the PM240-2 Push Through Power Modules on an unpainted metal
surface in order to comply with EMC requirements.
• To be able to mount PM240-2 Push Through Power Modules, the wall thickness of the
cabinet must be ≤ 3.5 mm.
Note
Installation frame for push through units
An installation frame should be used when push through units are installed in the cabinet.
You can find more information about the installation frame in Section Mounting frame
(Page 345).
This mounting frame includes the necessary seals and frame to ensure compliance with
degree of protection IP54.
If you do not use the mounting frames, you must ensure that the required degree of
protection is complied with using other appropriate measures.
112
WARNING
– For PM240-2 FSA, FSB and FSC Power Modules:
- Above: 80 mm (3.15 inch)
- Below: 100 mm (3.93 inch)
– For PM240-2 FSD, FSE and FSF Power Modules:
- Above: 300 mm (11.81 inch)
- Below: 350 mm (13.78 inch)
- Front: 100 mm (3.94 inch)