3.0 INSTALLATION AND OPERATION

3.1 TRANSPORTATION AND INSTALLATION

Table 3.1 How to transport and install the system

Transportation
Transport unit with forklift.
CAUTION : Do not transport in a horizontal position. Cabinets must be
CAUTION : Floor shall be flat and level. 3 inches surrounding mounting holes

3.2 INSTALLATION PROCEDURE

A) Note the load tolerance of the floor
Refer to Table 3.2 for list of UPS weights.
UPS Capacity (kVA)
Weight (lb.)
B) Minimum clearance required for ventilation
Right side
Left side
Back side
Top side
C) Space requirement for routine maintenance
Allow for the following space at the time of installation.
Front
Sides
Back side
Top side
9900CX SERIES UPS
OWNERS / TECHNICAL MANUAL
Using the pre-drilled 2 or 4 holes in the each UPS
channel base*, anchor the unit using appropriate
hardware. (Not provided)
* 4x 4-holes bases and 3x 2-holes bases
maintained upright within +/- 15° of the vertical during handling.
shall be flush with maintenance pad or floor.

Table 3.2 List of UPS Weights

1050
6283
25 mm (1 inch) (not required when sidecars are used)
25 mm (1 inch) (not required when sidecars are used)
0.0 mm (0 inch)
600 mm (24 inches) (for air flow)
1000 mm (39 inches)
0.0 mm (0 inch)
0.0 mm (0 inch)
500 mm (20 inches)
MITSUBISHI ELECTRIC 9900CX SERIES UPS
Installation
1400
1750
9580
11770
13530