C) OPERATION MENU (Figure 2.5)
This screen prompts the user to select: whether the start & stop operation will be performed by
local or remote operation; date & time adjustment; battery equalizing charge. The battery
equalizing charge operation key will appear when battery equalizing charge is set up (Setup is
based on battery type).
Figure 2.5 Remote/Local Operation or Date & Time Adjustment Select
D) LOG MENU (Figure 2.6)
This LOG MENU displays two Touch icons in EVENT LOG and BATTERY LOG.
Pressing the EVENT LOG icon, up to 100 condition/operation records will be displayed.
Press
or
button for page turning.
Pressing the BATTERY LOG icon, Number of battery operations and Summed battery
operation time are displayed.

Figure 2.6(b) Event Log

9900CX SERIES UPS
OWNERS / TECHNICAL MANUAL

Figure 2.6(a) Log Menu

MITSUBISHI ELECTRIC 9900CX SERIES UPS
Page Number:

Figure 2.6(c) Battery Log

2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

9900cx series9900c series

Table of Contents