ABB REF615R Engineering Manual
Hide thumbs Also See for REF615R:
Table of Contents

Advertisement

®
Relion
Protection and Control
REF615R
Engineering Manual

Advertisement

Table of Contents
loading

Summary of Contents for ABB REF615R

  • Page 1 ® Relion Protection and Control REF615R Engineering Manual...
  • Page 3 Document ID: 1MRS240044-IB Issued: 2013-11-22 Revision: A Product version: 4.0 © Copyright 2013 ABB. All rights reserved...
  • Page 4 Copyright This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents thereof must not be imparted to a third party, nor used for any unauthorized purpose. The software or hardware described in this document is furnished under a license and may be used, copied, or disclosed only in accordance with the terms of such license.
  • Page 5 In case any errors are detected, the reader is kindly requested to notify the manufacturer. Other than under explicit contractual commitments, in no event shall ABB be responsible or liable for any loss or damage resulting from the use of this manual or the application of the equipment.
  • Page 6 (EMC Directive 2004/108/EC) and concerning electrical equipment for use within specified voltage limits (Low-voltage directive 2006/95/EC). This conformity is the result of tests conducted by ABB in accordance with the product standards EN 50263 and EN 60255-26 for the EMC directive, and with the product standards EN 60255-1 and EN 60255-27 for the low voltage directive.
  • Page 7 Safety information Dangerous voltages can occur on the connectors, even though the auxiliary voltage has been disconnected. Non-observance can result in death, personal injury or substantial property damage. Only a competent electrician is allowed to carry out the electrical installation. National and local electrical safety regulations must always be followed.
  • Page 9: Table Of Contents

    Creating a new project................30 Building the plant structure..............31 Inserting an IED..................32 Inserting an IED in online mode............33 Inserting an IED in offline mode............40 Inserting an IED from the template directory........41 Inserting an IED by importing a .pcmi file..........43 REF615R Engineering Manual...
  • Page 10 Load Profile tool user interface............78 Information fields................79 Fault Record tool..................79 Opening and closing Fault Record tool..........79 Fault Record tool interface..............81 Section 6 LHMI engineering..............83 Single-line diagram engineering.............83 Diagrams in Graphical Display Editor..........83 Display window and sequence order..........84 REF615R Engineering Manual...
  • Page 11 Exporting SCL files from PCM600...........103 Exporting SCD files..............103 Exporting ICD or CID files............104 Engineering vertical and horizontal communication......105 Importing SCL files to PCM600............107 Importing SCD files..............107 Importing ICD or CID files............110 Writing communication configuration to the IED......110 Section 8 Glossary................113 REF615R Engineering Manual...
  • Page 13: Section 1 Introduction

    The engineering guide provides information for IEC 61850 engineering of the protection IEDs with PCM600 and IET600. This guide concentrates especially on the configuration of GOOSE communication with these tools. The guide can be used as a technical reference during the engineering phase, installation and commissioning REF615R Engineering Manual...
  • Page 14: Document Revision History

    1.3.2 Document revision history Document revision/date Product version History A/2013-11-22 First release Download the latest documents from the ABB Website http://www.abb.com/substationautomation. 1.3.3 Related documentation Product series- and product-specific manuals can be downloaded from the ABB Website http://www.abb.com/substationautomation. REF615R Engineering Manual...
  • Page 15: Symbols And Conventions

    The function can be enabled and disabled with the Operation setting. • Parameter values are indicated with quotation marks. The corresponding parameter values are "Enabled" and "Disabled". • IED input/output messages and monitored data names are shown in Courier font. REF615R Engineering Manual...
  • Page 16: Functions, Codes And Symbols

    All available functions are listed in the table. All of them may not be applicable to a specific configuration. Table 1: Functions included in the IED Function IEC 61850 IEC 60617 REF615R Protection Three-phase non-directional overcurrent protection, low stage, instance 1 PHLPTOC1 3I> (1) 51P-1 Three-phase non-directional overcurrent protection, high stage, instance 1 PHHPTOC1 3I>>...
  • Page 17 Section 1 1MRS240044-IB A Introduction Function IEC 61850 IEC 60617 REF615R Residual overvoltage protection, instance 1 ROVPTOV1 Uo> (1) Residual overvoltage protection, instance 2 ROVPTOV2 Uo> (2) 59N-1 Three-phase undervoltage protection, instance 1 PHPTUV1 3U< (1) 27-1 Three-phase undervoltage protection, instance 2 PHPTUV2 3U<...
  • Page 18 Section 1 1MRS240044-IB A Introduction Function IEC 61850 IEC 60617 REF615R Residual current measurement, instance 1 RESCMMXU1 Three-phase voltage measurement, instance 1 VMMXU1 VA, VB, VC Residual voltage measurement, instance 1 RESVMMXU1 Sequence voltage measurement, instance 1 VSMSQI1 U1, U2, U0...
  • Page 19 Section 1 1MRS240044-IB A Introduction Function IEC 61850 IEC 60617 REF615R Move (8 pcs), instance 8 MVGAPC8 MV (8) MV-8 Generic control points, instance 1 SPCGGIO1 SPC(1) CNTRL-1 Generic control points, instance 2 SPCGGIO2 SPC(2) CNTRL-2 Generic control points, instance 3...
  • Page 21: Section 2 Ied Engineering Process

    Configuring the GOOSE receive data connections to the IED's application configuration function blocks by using the Application Configuration tool and the Signal Matrix tool. • Configuring protocol data mapping for Modbus or DNP3 with the Communication Management tool. • Disturbance record management REF615R Engineering Manual...
  • Page 22 Creating recording file content overview reports for fast evaluation with assistance of the Disturbance Handling tool. • Service management • Monitoring the selected signals of an IED for commissioning or service purposes by using the Signal Monitoring tool. REF615R Engineering Manual...
  • Page 23 Organizing users regarding their rights, profiles and passwords to use different tools and functions in the tools. • Defining allowed activities for user profiles to use tools in PCM600. Once the engineering of the IED is finished, the results must be written to the IED. REF615R Engineering Manual...
  • Page 24: Monitoring And Control System Structure

    The plant structure is used to identify each IED in its location within the substation organization. Plant structure is a logical image of the substation and the bays within the substation. The organization structure for the IEDs may differ from the structure of the primary equipment in the substation. REF615R Engineering Manual...
  • Page 25: Standard Configuration Concept

    The standard configurations can be used as is, but they can also be modified by using the PCM600. The standard configuration itself can be modified or extended by using the Application Configuration tool, the Signal Matrix tool and the communication REF615R Engineering Manual...
  • Page 26 Application Configuration in PCM600, more resources in the IED become available for other purposes. • More advanced user application logic with Application Configuration • Extensive use of GOOSE sending and receiving • Increasing the amount of data reported for IEC 61850 clients REF615R Engineering Manual...
  • Page 27: Workflow

    It is possible to make a different kind of a sequence based on the information available at the time when the project is started. This means that several iterations may be needed to complete the project. REF615R Engineering Manual...
  • Page 28 Configuration tool; for example, a breaker object is linked to the circuit breaker control function. LHMI engineering • The LED behavior is defined with Parameter Setting. • The LEDs are configured with Application Configuration. Communication protocol engineering REF615R Engineering Manual...
  • Page 29 The Communication Management tool is used for communication protocols; for example, Modbus and DNP3. The IED restarts automatically when writing an IED configuration where changes have been made. It is not possible to communicate with the IED during restart. REF615R Engineering Manual...
  • Page 31: Section 3 Pcm600 Tool

    IEDs or entire substation in a standard file format which allows for station engineering. A PC with PCM600 can be connected to any REF615R IED within a station by using the Ethernet connection. The connection can also be used for service and maintenance purposes.
  • Page 32: Connectivity Packages

    The system settings must be set before a new PCM600 project is started. For more information, see PCM600 documentation. Connectivity packages A connectivity package is a software component that consists of executable code and data which enables system tools to communicate with an IED. Connectivity packages REF615R Engineering Manual...
  • Page 33: Pcm600 And Ied Connectivity Package Version

    PCM600 and IED connectivity package version • Protection and Control IED Manager PCM600 Ver. 2.5 or later • IED Connectivity Package REF615R Ver. 4.0 or later Download connectivity packages from the ABB web site http://www.abb.com/substationautomation PCM600 projects A typical project in PCM600 contains a plant structure including one or several IED objects, where each IED object contains the engineering data created or modified using the different PCM600 tools.
  • Page 34: Communication Between Pcm600 And The Ied

    Table 2: Ports that must be open in the firewall for different protocols Protocol TCP port File Transfer Protocol (FTP) 20, 21 IEC 61850 Web Server HTTP Simple Network Time Protocol (SNTP) Modbus TCP DNP TCP 20000 REF615R Engineering Manual...
  • Page 35: Section 4 Setting Up A Project

    Installing connectivity packages • Install connectivity packages either by running the installer which can be downloaded at the ABB Web site or by using the Update Manager when a network connection is available. Download connectivity packages from the ABB Website http://www.abb.com/substationautomation...
  • Page 36: Activating Connectivity Packages

    Activate the appropriate connectivity package in the Update Manager after the installation. The Update Manager shows the IEDs that are compatible with the installed PCM600 version. Select IED Connectivity Package REF615R Ver. n (n = version number) to use REF615R. Always use the latest version of the connectivity package. REF615R...
  • Page 37: Setting Up Ip Addresses

    The IED front port IP address is fixed to 192.168.0.254 and it cannot be modified. Set the IP address for the IED rear port and the corresponding subnet mask via the LHMI path: Configuration/Communication/Ethernet/Rear port. Default IP address for the IED rear port Corresponding subnet mask REF615R Engineering Manual...
  • Page 38: Creating A New Project

    If there are currently projects or object tools open, a confirmation dialog box opens. • Click Yes to close the open projects. A Create New Project dialog box opens. GUID-F7D1FC0A-CFD5-4A4C-900C-E1F90DEDF3BF V1 EN Figure 7: New Project dialog box REF615R Engineering Manual...
  • Page 39: Building The Plant Structure

    PCM600 sets up a new project that is listed under Projects on my computer. Building the plant structure Building a plant structure is useful when a complete grid with an essential number of IEDs has to be built. Create a new plant structure in one of the alternative ways. REF615R Engineering Manual...
  • Page 40: Inserting An Ied

    It is possible to do various tasks in the plant structure. • Insert an IED to offline mode or online mode • Import a template IED that is available in the template library as a .pcmt file • Import a preconfigured IED available as a .pcmi file REF615R Engineering Manual...
  • Page 41: Inserting An Ied In Online Mode

    IED type to be inserted. GUID-A435F1C8-EC04-45BB-AAD0-FFDAB001578B V1 EN Figure 10: Selecting the IED type An IED can also be dragged from the Object Types window to the bay level. The Configuration Mode Selection Page dialog box opens. REF615R Engineering Manual...
  • Page 42 Section 4 1MRS240044-IB A Setting up a project GUID-43678F72-F7A9-4691-960E-BD05771A93E9 V1 EN Figure 11: PCM600: Configuration mode selection Select Online Configuration and click Next. The Communication protocol selection page is displayed. REF615R Engineering Manual...
  • Page 43 Section 4 1MRS240044-IB A Setting up a project GUID-EBF9B7EB-E762-4DA0-ABD7-C7AAAB2ED2E4 V1 EN Figure 12: Selecting communication protocol In the IED protocol list, select the IED communication protocol and click Next. The Communication protocol page is displayed. REF615R Engineering Manual...
  • Page 44 PCM600: Communication port and IP address In the Port list, select the port. • If the rear port is selected, insert the correct IP address (of the physical IED to be configured) into the IP address box. Communication configuration is now defined. REF615R Engineering Manual...
  • Page 45 1MRS240044-IB A Setting up a project GUID-ACFFBD66-6F2C-4761-B158-43165EF7DB92 V1 EN Figure 14: Communication configuration defined Click Next in the Configuration Wizard. Click Scan to scan/read the order code of the IED. The Order code detection page is displayed. REF615R Engineering Manual...
  • Page 46 Setting up a project GUID-C6BA4A9D-3513-470F-A5AB-7806EB9D36D8 V1 EN Figure 15: PCM600: Order code detection page Click Next. The Setup Complete Page dialog box shows the summary of the IED type, version, IP address and the selected order number. REF615R Engineering Manual...
  • Page 47 From the Plant structure view, check that PCM600 has turned online the IED that was inserted to the bay level. You cannot scan data from the IED or proceed further if the IED is not online or if the IP address is not correct. REF615R Engineering Manual...
  • Page 48: Inserting An Ied In Offline Mode

    Alternatively, drag an IED from the Object Types view to the bay level. The Configuration Mode Selection Page dialog box opens. GUID-DFA5DB6C-569A-44BE-A87B-89CCB1BC8434 V1 EN Figure 17: PCM600: Configuration Mode Selection Wizard Select Offline Configuration and click Next. REF615R Engineering Manual...
  • Page 49: Inserting An Ied From The Template Directory

    A template IED can be inserted only when the bay is selected in the plant structure. In the Plant structure view, select the bay, right-click, point to New and select Create from template. The Create New Object from Template dialog box opens. REF615R Engineering Manual...
  • Page 50 Click the icon on the right column in the list of available templates. The Template Properties dialog box opens. GUID-0AC6C838-914E-487E-9538-97E340ADD242 V1 EN Figure 19: PCM600: template information Check and verify the template information and click Close to close the dialog box. REF615R Engineering Manual...
  • Page 51: Inserting An Ied By Importing A .Pcmi File

    It is possible to create a new IED object in the plant structure by importing a .pcmi file. In the Plant Structure view, right-click the bay and select Import. A .pcmi file can be imported only when the bay is selected in the plant structure. REF615R Engineering Manual...
  • Page 52: Setting The Ied Ip Address In A Project

    IED can only be set via the LHMI and cannot be set from PCM600. The PC and IED may need to be on the same subnet. In PCM600, there are two alternatives to set the IP address of an IED object. REF615R Engineering Manual...
  • Page 53 On the first page of the wizard when including a new IED into a project. • In the IP address box of the IED's Object Properties dialog box. GUID-2084CB5B-2197-4783-A298-9AC296209F38 V1 EN Figure 21: Alternative 1: setting the IP address on the first wizard page REF615R Engineering Manual...
  • Page 54: Technical Key

    IEDs in the same PCM600 project. The IED is delivered with a factory default technical key. The validation of the technical keys between PCM600 and the IED does not occur if the IED contains the factory default technical key. REF615R Engineering Manual...
  • Page 55: Iec 61850 Naming Conventions To Identify An Ied

    If the value is used as a reference to an object, it is contained in an attribute name starting with a string denoting the reference target object type and ending with the string Name. The REF615R Engineering Manual...
  • Page 56 In the example, the Bay SCL Technical Key part is Q01 and IED is A1. The user-oriented textual designation is visible in the Plant structure view for each object. It is the name given by default or changed by using the Rename function. REF615R Engineering Manual...
  • Page 57: Setting The Technical Key

    A1 = first IED in the bay Q01 4.8.2 Setting the technical key In the Plant Structure view, right-click the IED and select Set Technical Key in IED. From the list that opens, select Set Technical Key in IED. REF615R Engineering Manual...
  • Page 58 Section 4 1MRS240044-IB A Setting up a project GUID-CCBE8F3A-BB1D-433C-961D-3520C984A722 V1 EN Figure 25: PCM600: Setting the technical key on the IED level A dialog box opens to inform about the technical key concept. REF615R Engineering Manual...
  • Page 59 Maximum length of technical key is 20 characters. Technical key must begin with an alphabetic character (A-Z, a-z), but the remaining characters can be alphanumeric or underscore (A-Z, a- z, 0-9,_). Click OK to confirm the selection. REF615R Engineering Manual...
  • Page 60: Com600 Project

    COM600 project REF615R connectivity package supports SAB600. The IED is imported as a REF615R device. It is also possible to import a full PCM600 project including several REF615R devices to SAB600. In this case, PCM600 project information is imported to SAB600 using a SCD file.
  • Page 61 Section 4 1MRS240044-IB A Setting up a project GUID-E016DC92-939C-4DAE-A066-68CAE7B36120 V1 EN Figure 28: Creating a PCM600 project including several devices Export the SCD file from PCM600. In the Plant structure view, select the substation, right-click and select Export. REF615R Engineering Manual...
  • Page 62 IEC09000687 V1 EN Figure 29: Exporting SCD file from PCM600 and importing it to SAB600 Import the SCD configuration into the SAB600 project. In the Project Explorer view, right-click the IEC61850 OPC Server object and select Import. REF615R Engineering Manual...
  • Page 63 Section 4 1MRS240044-IB A Setting up a project GUID-70E8B187-FADA-4657-9BC7-223FDA7374ED V1 EN Figure 30: Importing the SCD configuration into the SAB600 project In the SCL Import view, click Select File to select the SCD file exported from PCM600. REF615R Engineering Manual...
  • Page 64: Using The Web Hmi

    To establish a remote WHMI connection to the IED, contact the network administrator to check the company rules for IP and remote connections. WHMI is enabled by default. Log in with the proper user rights to use the WHMI. REF615R Engineering Manual...
  • Page 65: Ied User Management

    GUID-FC9D4AB3-C472-4BDB-B64B-DEE4FEACC4FA V1 EN Figure 32: Changing the password using the IED User Management tool If the remote authentication has been enabled, changes have to be made in PCM600 to make the communication between the IED and PCM600 work. REF615R Engineering Manual...
  • Page 66 When communicating with the IED with PCM tools and with the IED authentication enabled, the IED user name and password must be given when prompted. When setting the technical key, the user name and password must be given twice. GUID-310E1587-D064-4823-9329-12163E0C9306 V1 EN Figure 34: User login REF615R Engineering Manual...
  • Page 67 Event Viewer tool. By default, the audit trails are not shown in the Event Viewer tool. To view them, change the default ADMINISTRATOR IED password by using the IED User Management tool, and log in as ADMINISTRATOR IED user when opening the Event Viewer tool. REF615R Engineering Manual...
  • Page 69: Section 5 Protection And Control Engineering

    MainApplications as well as providing different application programming features. • Organize an application configuration • Organize an application configuration into a number of logical parts (MainApplication) • Organize a MainApplication over a number of pages • Features for programming an application configuration REF615R Engineering Manual...
  • Page 70: Function Blocks

    • Set IEC or/and ANSI naming style. • Lock function blocks. • Set visibility for execution order, cycle time and instance number. • Manage signals; for example, hide, show and rearrange. • Invert Boolean inputs and outputs. REF615R Engineering Manual...
  • Page 71: Signals And Signal Management

    Signals are located up and down on both sides of the middle position. When there is space left, some signals may be moved up or down for better visibility and connection routing. REF615R Engineering Manual...
  • Page 72: Function Block Execution Parameters

    The Execution Order and Instance Number are a combination that is predefined within a product. It is possible to select a pair out of the list. REF615R Engineering Manual...
  • Page 73: Execution Order And Feedback Loops

    The following example shows a simple situation where the execution order causes one cycle time delay if the NOT port is executed in the order determined by the automatic calculation. REF615R Engineering Manual...
  • Page 74: Configuration Parameters

    Connections and variables A connection is the link or "wire" between function block outputs and inputs. There are rules and methods for making connections. • Drag a line between two signals • Link two signals by using variables REF615R Engineering Manual...
  • Page 75: Hardware Channels

    When a hardware channel is connected, a graphical symbol appears in the Application Configuration tool. The connection is also displayed in the Signal Matrix tool with a cross mark. Hardware channels are always visible in the Signal Matrix tool. REF615R Engineering Manual...
  • Page 76: Validation

    During the logic creation, while making a connection or placing a function block • On demand by starting the validation • When writing the application configuration to the IED 5.1.8.1 Validation when creating an application configuration Validation is made when creating the application configuration. REF615R Engineering Manual...
  • Page 77: Validation On Demand

    Application Configuration tool can be closed with open errors, but not written to the IED. These problems are listed in the Output view under the Application Configuration tab. Double-clicking the error or warning row navigates to the MainApplication/ Page/ Area, where the problem was identified. REF615R Engineering Manual...
  • Page 78: Validation When Writing To The Ied

    A common writing from PCM600 to the IED, where parameters are changed in the Parameter Setting tool, overwrites any parameter changes made locally with LHMI. All variables listed and displayed in the parameter list can be sorted into two groups. REF615R Engineering Manual...
  • Page 79: Configuration Parameter

    IED parameter import and export IED parameters can be imported and exported in XRIO file format. The parameter import/ export functionality is available via the File menu when the Parameter Setting tool is open. GUID-4A63FE0D-7846-4387-A5D3-BD7B4F519A76 V1 EN Figure 42: Parameter import/export REF615R Engineering Manual...
  • Page 80: Ied Parameter Organization

    GOOSE signal input engineering. The Signal Matrix tool cannot be used for adding or removing function blocks, for example, GOOSE receive function blocks. The Application Configuration tool is used for this kind of operations. REF615R Engineering Manual...
  • Page 81 A binary output channel can only be activated from one function block output. If it is activated from more than one function block output, the glue logic has to be used. REF615R Engineering Manual...
  • Page 82 Depending on the IED capability, the Signal Matrix tool has a separate sheet for each possible combination. The possible sheets are: • Binary inputs • Binary outputs • Analog inputs • Functions • GOOSE REF615R Engineering Manual...
  • Page 83: Load Profile Tool

    PCM600 is Wavewin, but a third party viewer can be used. 5.4.1 Opening and closing Load Profile tool • To open the Load Profile tool, click Load Profile Tool on the context menu of an IED node inside the PCM600 project tree. REF615R Engineering Manual...
  • Page 84 The Load Profile tool runs in the same process as PCM600 but in a separate window. Multiple instances of the tool can be run at the same time. Any open tool instances are closed without confirmation when PCM600 is closed. REF615R Engineering Manual...
  • Page 85 Section 5 1MRS240044-IB A Protection and control engineering GUID-4B275369-045F-4407-89A2-44071839699D V1 EN Figure 46: Load Profile tool By default, the Load Profile tool uses the \PCMDataBases\LPR directory as a saving target directory. REF615R Engineering Manual...
  • Page 86: Load Profile Tool User Interface

    Clear Clicking the Clear button clears record from either the Load Profile tool or IED or both. Before deleting the records, a confirmation dialog box is shown. Table continues on next page REF615R Engineering Manual...
  • Page 87: Information Fields

    IED or the tool. 5.5.1 Opening and closing Fault Record tool • To open the Fault Record tool, right-click an IED node in the PCM600 project tree and select Fault Record Tool. REF615R Engineering Manual...
  • Page 88 The Fault Record tool runs in the same process as PCM600 but in a separate window. Multiple instances of the tool can be run at the same time. Any open tool instances are closed without confirmation when PCM600 is closed. REF615R Engineering Manual...
  • Page 89: Fault Record Tool Interface

    .txt file. Additionally the user can select any particular fault record and right-click to copy the selected record. REF615R Engineering Manual...
  • Page 91: Section 6 Lhmi Engineering

    The Graphical Display Editor is used for various tasks. • HMI display raster layouts • Adding static text • Adding measurands • Adding busbars • Adding symbols onto display page • Drawing lines (creating a link) • Adding buttons to control ACT application with SPCGGIO REF615R Engineering Manual...
  • Page 92: Display Window And Sequence Order

    Measurements and the single-line diagram can be displayed on the page in any possible order and placement. • All symbol objects, for example apparatus and measurement, on the HMI page must be linked to the correct function block in the application configuration to present the correct process values. REF615R Engineering Manual...
  • Page 93: Symbol Library

    IEC representation ANSI representation Circuit breaker — Intermediate position Circuit breaker – Open position Circuit breaker – Closed position Circuit breaker – Bad (faulty) position Disconnector – Intermediate position Disconnector – Open position Table continues on next page REF615R Engineering Manual...
  • Page 94 Disconnector – Bad (faulty) position Truck – Intermediate position Truck – Open position Truck – Closed position Truck – Bad (faulty) position In-feeder Out-feeder Current transformer Voltage transformer Ground symbol Motor Generator Table continues on next page REF615R Engineering Manual...
  • Page 95: Hmi Display Raster Layout And Text Font Selection

    Object Properties view. Selecting and toggling Show Texts using the IED fonts can be used to preview the single- line diagram to see how it will be presented in the real HMI display. REF615R Engineering Manual...
  • Page 96: Adding Static Text

    Adding a static text field into a LHMI view Edit the text in the Name field in the Object Properties view, or alternatively double-click the text to edit it. 6.1.1.7 Adding select buttons Drag a Select Button object into a raster box. REF615R Engineering Manual...
  • Page 97: Adding A Measurand

    GUID-04FCDF78-2E81-417A-8F2E-035AAD3A976D V1 EN Figure 52: Select button Right-click the select button symbol, point to Select Input Signal and select the input signal from the list. 6.1.1.8 Adding a measurand Place a Measurand object into a raster box by dragging-and-dropping. REF615R Engineering Manual...
  • Page 98: Adding A Busbar

    If the Unit text is empty in the Graphical Display Editor, no unit is shown. The Scale factor parameter is not used. 6.1.1.9 Adding a busbar Add at least two Busbar Junctions. Add links between the Busbar Junctions. REF615R Engineering Manual...
  • Page 99: Adding Symbols Into A Display Page

    Place the junction points. Do not connect two symbols directly to each other. Instead, add a junction between them. Use the X and Y coordinates in the Object Properties window to adjust the placement of symbols in the single-line diagram. REF615R Engineering Manual...
  • Page 100: Drawing Lines To Create Links

    To draw a line, move the mouse pointer to the center of the connection point (visible in two circles at the end points of a line). Click to start and move the mouse pointer to the destination connection point. Center the mouse pointer again and click to drop the line. REF615R Engineering Manual...
  • Page 101: Bay Configuration Engineering

    Once the symbols are placed on the HMI page, they must be linked to the corresponding function block in the application configuration, which protects or controls the object that the symbol on the HMI page represents. REF615R Engineering Manual...
  • Page 102: Creating A Complete Hmi Display Page

    GUID-F21E4F43-442D-4868-BAA3-EBA903E9C62E-ANSI V1 EN Figure 57: Graphical Display Editor: establishing a dynamic object link 10. Ensure that all links are done. 11. Save the complete picture. 12. Write to the IED. 13. Validate the single-line diagram on the IED. REF615R Engineering Manual...
  • Page 103: Linking Process Objects

    Select the switch control application function block that corresponds to the selected apparatus. Right-click the measurement symbol and select Select Input Signal. A list of the engineered measurement application function blocks opens. Select the measurement application function block that corresponds to the selected symbol. REF615R Engineering Manual...
  • Page 104 The ordering number in the selection window of the process objects corresponds to the number given in the Parameter Setting tool tree and to the application function block in the Application Configuration tool. Only the apparatus and measurements that are configured in the application configuration program are displayed. REF615R Engineering Manual...
  • Page 105 Section 6 1MRS240044-IB A LHMI engineering GUID-1DB1A930-A312-4B55-8F68-3D8327A873FB V1 EN Figure 59: Graphical Display Editor: object properties view for text insertion REF615R Engineering Manual...
  • Page 107: Section 7 Iec 61850 Communication Engineering

    The technical manual describes the function blocks defined as logical nodes • The IEC 61850 engineering guide • The IEC 61850 parameter list IEC 61850 interface For more information on the implementation of IEC 61850 in IEDs, see IEC 61850 engineering guide. REF615R Engineering Manual...
  • Page 108: Iec 61850 Interface In The Ied

    The concept is based on sending a multicast over the Ethernet. Whoever needs the information, detects the telegram by its source address, reads the telegram and handles it. The telegrams are multicast sent and not acknowledged by the receiver. REF615R Engineering Manual...
  • Page 109: Function View For Iec 61850 In Pcm600

    The concept in the IED is such that the IEC 61850 data for each function instance is available in the data model, even when the function is not used in the application. This means that it is not necessary to handle any instance information for the functions regarding IEC 61850. REF615R Engineering Manual...
  • Page 110: Station Configuration Description File Types

    • An IED is already extended by default data sets and report control blocks. They are predefined by ABB. Changes or additional data sets, for example, have to be done with IEC 61850 Configuration tool or IET600. •...
  • Page 111: Exporting Scl Files From Pcm600

    IED configurations must be finalized as far as possible before starting the IEC 61850 configuration part. 7.3.1.1 Exporting SCD files Select the station in the Plant Structure view. REF615R Engineering Manual...
  • Page 112: Exporting Icd Or Cid Files

    Click Export to export the private sections to the SCD file. A progress window shows the ongoing export of the station. 7.3.1.2 Exporting ICD or CID files Select the IED in the Plant Structure view. Right-click the IED and select Export... REF615R Engineering Manual...
  • Page 113: Engineering Vertical And Horizontal Communication

    For IEC 61850 engineering a separate system configuration tool is needed to be used with PCM600. In PCM600 Ver. 2.5 or later the recommended tool for smaller projects is the IEC 61850 Configuration tool. For larger projects it is recommended to use IET600, which is available as a standalone tool. REF615R Engineering Manual...
  • Page 114 4.3. Link the IEDs to the GOOSE control block that is to receive the GOOSE control block. Export the updated SCD file. All data sets, Report Control Blocks and GOOSE control blocks must be located in LLN0. [1] Applicable when using IET600 REF615R Engineering Manual...
  • Page 115: Importing Scl Files To Pcm600

    IED type(s) in the SCD file, whether or not the IED type(s) in the SCD file matches the IED object(s) in PCM600. • Click Ignore Substation Section to not import the SSD file part of the SCD file. Click Import when the file definition has been completed. REF615R Engineering Manual...
  • Page 116 Make connections between the signals that the server is sending and the function blocks on the receiver's side. Write the configuration to the IED. In the Plant Structure view, select the IED, right-click and select Write to IED. REF615R Engineering Manual...
  • Page 117 Section 7 1MRS240044-IB A IEC 61850 communication engineering GUID-0CD603CC-AAB4-4447-9760-93496D85205F V1 EN Figure 68: Common write menu The engineered data is written to the IED when executing a common Write to IED operation. REF615R Engineering Manual...
  • Page 118: Importing Icd Or Cid Files

    IEC 61850 communication depends on the proper communication configuration in all IEDs that communicate via IEC 61850. It is possible to make a configuration change in one IED, without affecting the communication engineering. For example, when the Application Configuration tool REF615R Engineering Manual...
  • Page 119 Click No in the Update Communication window to keep the communication configuration part in the IED. Other parts of the configuration will be updated. If no changes have been done in the communication configuration part, click No in the Update Communication window. REF615R Engineering Manual...
  • Page 121: Section 8 Glossary

    Graphical Display Editor in PCM600 GoCB GOOSE control block GOOSE Generic Object-Oriented Substation Event Human-machine interface Hardware Input/output IED capability description International Electrotechnical Commission IEC 61850 International standard for substation communication and modeling Intelligent electronic device IET600 Integrated Engineering Toolbox REF615R Engineering Manual...
  • Page 122 RTU devices. Signal Monitoring tool in PCM600 Network control center PCM600 Protection and Control IED Manager Parameter Setting tool in PCM600 REF615R Wire-alike replacement option for DPU2000R with the same form factor SAB600 Substation automation builder tool Substation configuration description...
  • Page 124 Contact us ABB Inc. Distribution Automation 4300 Coral Ridge Drive Coral Springs, FL 33065, USA Phone +1 (800) 523-2620 Phone +1 954-752-6700 +1 954 345-5329 www.abb.com/substationautomation...

Table of Contents