3.5 Installation Clearance Requirements of an RRU

This section describes the requirements for the installation clearance of multiple RRUs and the
requirements for the installation spacing between RRUs.

3.5.1 Installation Clearance for Multiple RRUs

This section describes the recommended and minimum installation clearance for multiple RRUs.
Recommended Installation Clearance for Multiple RRUs Installed in Centralized
Mode
Figure 3-9
centralized mode.
Issue DraftA (2015-05-30)
NOTE
shows the recommended installation clearance for multiple RRUs installed in
Huawei Proprietary and Confidential