Figure 2-37 Connecting The Battery Connection Cable; Figure 2-38 Installation Of Front Cover; Mounting The Ip4Ww-Battery Box - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

ISSUE 1.0
13. Plug the Battery Connection Cable into the Fuse unit.
14. Align tabs a to f to holes A to F on Battery Box. Slide the Front cover and tighten the two screws.
f
Front cover

2.6 Mounting the IP4WW-Battery Box

The IP4WW-Battery Box can be installed on either the floor or wall. One Chassis can be mounted on
an IP4WW-Battery Box.
2.6.1 Floor-Mounting the IP4WW-Battery Box
Battery box can be mounted on the floor using the FM/WM Base-F, FM/WM Base-R and WM Support.
(Note: FM = Floor-Mount and WM = Wall-Mount)
Hardware Manual
Battery Connection
Cable
Fuse unit

Figure 2-37 Connecting the Battery Connection Cable

d
b

Figure 2-38 Installation of Front Cover

F
D
B
c
a
e
Two screws
(with stopper)
SL2100
E
C
A
2-29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents