Page 2
Refer to the list in the following page to find the authorised dealer near you. THE RADIOGRAPHIC SYSTEM DESCRIBED IN THIS MANUAL REFERS TO A WALL INSTALLATION. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 3
WITHOUT PRIOR WRITTEN CONSENT BY de GÖTZEN® S.r.l. – ACTEON Group. THE MANUAL MUST ALWAYS BE KEPT NEAR THE MEDICAL DEVICE FOR FUTURE REFERENCE. de Götzen® S.r.l. – ACTEON Group SHALL NOT BE LIABLE FOR AN INCORRECT USE OF THE INFORMATION CONTAINED IN THIS MANUAL.
Page 4
ENGLISH INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
- certify the work done by a “Declaration of Conformity”; - return to de Götzen® S.r.l. – ACTEON Group the warranty certificate duly filled in: if this is not done, the warranty is not valid. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
“x-mind ac®” for reference; - in case of repair, please use only spare parts from the manufacturer of the “x-mind ac®”; otherwise basic safety and essential performances of the device will not be guaranteed.
X-ray imaging of other body parts. Carefully follow the instructions in this manual to install, operate and maintain the “x-mind ac®” radiographic system. In the event that local laws and standards are more restrictive than the manufacturer’s indications, the former supersede the latter.
Page 10
3. Reduction of the limits of individual dose and risks The “x-mind ac®” is a medical device that generates X-rays; therefore, both the patients and the operator are exposed to risks due to ionizing radiation. The physician must assess the actual need for X-ray exposure.
Adjustments or any kind of attempt of repairing or disassembling must only be performed by qualified and authorized service personnel. The “x-mind ac®” must not be used in environments or close to environments subjected to mechanical vibrations or mechanical shocks.
Page 12
SYSTEM MODIFICATIONS OR UPGRADES Modifications or upgrades of the system can be carried out only if advised by de Götzen® S.r.l. – ACTEON Group and performed by authorized and qualified personnel, using ONLY genuine original spare parts of de Götzen® S.r.l. – ACTEON Group.
Page 13
ENGLISH CHAPTER 2 2.1. RADIOGRAPHIC SYSTEM The “x-mind ac®” radiographic system guarantees the maximum safety both for the operator and the patient. It is built in compliance with the following European Directives: } 93/42/EEC and subsequent amendments MEDICAL DEVICES } EURATOM 96/29 IONISING RADIATIONS and in compliance with the following American Standard: } American Radiation Performance Standard 21CFR, Subchapter J, Sec.
It is made of light alloy with an ABS coating. 5. TUBEHEAD x-mind ac® The intra-oral tubehead “x-mind ac®” is a monoblock type and its light alloy housing contains an airtight com- partment. The high voltage transformer, the X-ray tube and the expansion chamber are submerged in highly dielectric insulating oil inside a light alloy container.
Page 15
BRACKET 400: L = 41 cm – 16” 9/64 BRACKET 800: L = 82,5 cm – 32” 31/64 BRACKET 1100: L = 110 cm – 43” 5/16 BRACKET 400 INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 17
ENGLISH Fig. 3 and 4 show the typical dimensions of the radiographic system: INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
® de Götzen S.r.l. Via Roma 45 - 21057 Olgiate Olona (VA) – ITALY Rated line voltage: 230V 50/60Hz Class I Absorbed power: 0,8kVA IP20 INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 19
Götzen S.r.l. Via Roma 45 - 21057 Olgiate Olona (VA) – ITALY Rated line voltage: 115V 50/60Hz Class I Absorbed power: 0,66kVA IP20 CONE GRADUATED SCALE INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 20
ATTENTION, REFER TO THE ATTACHED DOCUMENTS REFER TO MANUAL’S INSTRUCTIONS WEEE (Waste Electrical and Electronic Equipment) SYMBOL, IN CONFORMITY WITH 2012/19/ CE DIRECTIVE AND EN 50419 STANDARD. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 21
- The power conductors of the timer and the connection conductors with the tubehead must be two-pole + ground with section suitable to the length of the power supply line (Chart B). INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 22
} timer electric cables; } cables for the connection between timer and tubehead; } cables for the connection between the timer and the X-ray signalling lamp for external use x-mind ac® LIGHT (OPTIONAL); } cables for the connection between the timer and the remote control button x-mind ac® ECB (OPTIONAL).
Page 23
CHAPTER 4 4.1. INSTALLATION CAUTION The “x-mind ac®” radiographic system must be installed by professionally trained technicians, who must be able to certify their work by “Decla- ration of Conformity”. WARNING Prior to installing the radiographic system, it is advisable to verify that all needed requirements have been satisfied (refer to Chapter 3).
Page 24
To fix the wall plate DO NOT use plastic or rubber anchor screws. For cement walls, or built with solid or hollow bricks, use metal anchor screws Ø12 (NOT included in the supply). INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 25
Generally, the stop key is installed so that the equipment position at rest is on the right side of a possible watcher standing in front of the wall plate (Fig. 7A). Should the position at rest be on the left side, the stop key must be rotated by 180° (Fig. 7B). INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 26
7. Assemble the guard slat. 8. Insert the cable into the bracket and push it until reaches the pin outlet near the supply terminal board. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 27
} the timer must be mounted on the left side of the wall plate; } the distance between timer and wall plate must be 2,5mm; INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
2. Check that all the rating data match the power supply voltage. 3. Remove both guards from the pantograph type arm by loosening the relevant screws. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 29
7. Insert the supporting rest. 8. Check that during insertion, the pin of the turning preventing device correctly fits the seat located on the pantograph head. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 30
To reach the adjustment screw Y, the arm B must be put in horizontal position. The adjustment key provided can be inserted only under the above conditions. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 31
Repeat the test and adjustment until the arm A is steady and stable in all positions, even when the arm B is completely extended. 5. Insert the movable finish F between the pantograph type arm guard and metal frame. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 32
6. Insert the pins of the guards into the relevant seats; then position them and check that the movable finish is coupled to the guards. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 33
While stripping the cables, pay attention to the small copper wires that may fall on the printed circuit and cause short circuits or malfunc- tions. CONNECTION TO THE SUPPLY TERMINAL BOARD INSTRUCTION 1. Remove the terminal board cover 1 by unscrewing the fixing screw 2. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 34
4. Connect the wall plate to the grounding potential 7. 5. Clamp the cables with the cable clamps provided. 6. Reassemble the terminal board cover. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 35
TUBEHEAD 1 X-ray SIGNALLING LAMP - OPTIONAL TUBEHEAD 2 X-ray SIGNALLING LAMP - OPTIONAL NOT AVAILABLE NOT AVAILABLE TUBEHEAD 1 POWER SUPPLY TUBEHEAD 2 POWER SUPPLY TIMER POWER SUPPLY INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 36
The above configuration depends on the position of dip-switch on the timer electronic card: LEGEND ON = INSTALLED OFF = NOT INSTALLED IF THE LONG CONE IS USED 31cm = 12” (SSD) INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 37
►N° control button ►Type of cone (8” /12”) inside the timer, by changing the dip-switch position THIS OPERATION MUST BE CARRIED OUT BY THE INSTALLER ONLY INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 38
►if the tubehead connected to the XRAY2 is ac, put the dip-switch n° 4 in the OFF position; otherwise put it in the ON position. PLEASE NOTE It is possibile to connect to the timer of type AC: n° 2 x-mind ac® tubeheads To change the amount of control buttons installed, move the dip-switch n° 5: DIP SWITCH...
Page 39
►with short cone (8”=20cm (SSD)) move the dip-switch 6 to the OFF position; ►with long cone (12”=31cm (SSD)) move the dip-switch 6 to the ON position. PLEASE NOTE After modification, the set exposure times are automatically changed. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 40
If the timer remains inactive for a few minutes, it switches to the stand-by mode. Press any key on the control panel to restore it to the operative mode. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 41
1. Connect the instrument to the power supply line. 2. Set an exposure time of approximately 3s on the timer. 3. Carry out an exposure and read the current value on the instrument. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 42
Vn ± 10% MAXIMUM VOLTAGE DROP NOMINAL HIGH VOLTAGE 70 kV NOMINAL CURRENT 8 mA SET EXPOSURE TIME 3,2 s The radiographic voltage is 70kVp ±10%. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 43
►MAXIMUM ERROR IS ±10% or ±20ms WHEN LINE VOLTAGE IS EQUAL TO NOMINAL VOLTAGE PERFORM THE CHECK OF ACCURACY OF THE EXPOSURE TIME AS DESCRIBED IN THE FOLLOWING INSTRUCTIONS. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 44
± 5 % or ± 20msec the accurancy is checked when the % error is By adoptiong the most favorable condition PLEASE NOTE Otherwise, call the “Assistance Service”. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
ENGLISH CHAPTER 9 9.1. DIAGNOSTIC With “x-mind ac®” radiographic system it is possible to set and visualise certain functional parameters. To set the parameters, the installer must: 1. turn off the timer; 2. press simultaneously and keep pressed the keys:...
Page 46
2. press the key associated to the parameter one wishes to visualise: DISPLAY PARAMETER RADIOGRAPHIC SYSTEM NOMINAL VOLTAGE LINE VOLTAGE MAXIMUM LINE VOLTAGE VALUE DETECTED MINIMUN LINE VOLTAGE VALUE DETECTED SOFTWARE VERSION INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
CHAPTER 10 10.1. ERROR MESSAGES The following chart gives a list of error messages that may appear while “x-mind ac®” radiographic system is working. The chart also includes the causes of the error messages and what to do to solve them.
16. Check the pantograph type arm cable: should it be damaged, send the pantograph type arm to the manufacturer for repairs 17. Check the pantograph type arm guards INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
29. Load the spring of the pantograph type arm B using the key provided 30. Give power and check the correct operation of the radiographic system INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 50
2. Temporarily remove the guard of the timer 1 by unscrewing the fixing screws 2. 3. Spot the fuse to be replaced. 4. Remove the plastic protection. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 51
8 AF – 250 V 6,3 AF – 250 V 7. Put in place the protection. 8. Close the timer guard. 9. Turn on the power supply. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Contact your supplier before disposing of this product. CAUTION To avoid any risk of environmental contamination, do not dispose the device and its accessories together with the domestic waste. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 63
Q.TY PCS (RAL 9010 color) TOP MOUNT BRACKET 400 29700620.C 29700620 COMPLETE TOP MOUNT BRACKET 800 29700621.C 29700621 COMPLETE TOP MOUNT BRACKET 1100 29700622.C 29700622 COMPLETE INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 64
PLEASE NOTE The measurements criteria are based on the requirements stated by the applicable standards listed in the annex A.3 of this manual. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 65
X-ray TUBE X-ray tube model TOSHIBA DG-073-AC Focal spot size (IEC 336) 0,7 mm Anode angle 20° Anod material tungsten Heating/cooling curves of the TOSHIBA DG-073B-AC INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 66
19,5 kg (wall mounting) Total weight 50 kg (mobile version) Weight of the tubehead 5,5 kg Mechanical configuration Wall mounting, top and bottom / Mobile INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 67
31 cm (12’’) rectangular cone 31 cm (12’’) short cone ≤ 60 mm X-ray beam dimension long cone ≤ 60 mm rectangular cone 44x35 mm INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
“x-mind ac®” is for INDOOR USE ONLY. If the “x-mind ac®” has been stored at a temperature below +10°C (+50° F) for more than a few hours, enough time must be allowed for the device to reach the room temperature before reconnecting it to the mains voltage and applying power.
Page 71
Guidance and manufacturer’s declaration – electromagnetic emissions “x-mind ac®” is intended to be used in the electromagnetic environment specified below. The customer or the operator of “x-mind ac®” must ensure that the device is used in this type of environment.
Page 72
ENGLISH Guidance and manufacturer’s declaration – electromagnetic immunity “x-mind ac®” is intended to be used in the electromagnetic environment specified below. The customer or “x-mind ac®” operator must ensure that the device is used in this type of environment. Electromagnetic...
Page 73
ENGLISH Guidance and manufacturer’s declaration – electromagnetic immunity “x-mind ac®” is intended to be used in the electromagnetic environment specified below. The customer or “x-mind ac®” operator must ensure that the device is used in this type of environment. CEI EN 60601...
Page 74
Note 1: At 80 MHz and 800 MHz apply the separation distance corresponding to the highest frequency range. Note 2: These guidelines may not apply in every situation. Electromagnetic propagation is affected by absorption and reflection from structures, objects and people. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 75
WALL INSTALLATION Lateral view (rest position) Bottom mount 40 cm (16’’) bracket 63 cm 80 cm (31’’) bracket 104 cm 110 cm (43’’) bracket 132 cm INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 76
Manual. MOBILE INSTALLATION “x-mind ac®” exists also in the mobile version and it is sustained by the stand shown in the following figure: For details, refer to the Mobile Unit Technical Note, supplied with this structure. INSTALLATION & MAINTENANCE MANUAL • X-MIND AC • V2 • (06) • 08/2016 • NXACEN020B...
Page 78
Götzen S.r.l • A company of ACTEON Group Via Roma 45 • 21057 OLGIATE OLONA (VARESE) • ITALY Tel +39 0331 376 760 • Fax +39 0331 376 763 E-mail: info.italia@acteongroup.com •ww.acteongroup.com...
Need help?
Do you have a question about the X-MIND AC and is the answer not in the manual?
Questions and answers