Removal And Installation Of Machine Monitor Assembly - Komatsu Galeo PC138US-8 Shop Manual

Hydraulic excavator
Hide thumbs Also See for Galeo PC138US-8:
Table of Contents

Advertisement

50 Disassembly and assembly
Removal and installation of
machine monitor assembly
Removal
k
Disconnect the negative (–) terminal of the
battery beforehand.
1.
Remove the 2 mounting bolts and cover (1).
a One of the mounting bolts is installed
inside the cap on the right of the daylight
sensor.
a While removing cover (1), simultaneously
disconnect wiring connector P31 of the
daylight sensor.
a A level gauge is installed to the top of the
monitor panel on the machine of arm
crane specifications. Remove the level
gauge.
2.
Remove duct (2).
PC138US, USLC-8
3.
Disconnect connector (3) to (5).
1
4.
Remove 3 mounting bolts (6) and remove
machine monitor assembly (7).
Installation
Carry out the installation in the reverse order of
q
removal.
SEN02716-00
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Galeo pc138uslc-8

Table of Contents