Chapter 2. Installing Cabinets; Procedure For The System Installation; Selecting Installation Method - Samsung OfficeServ 7100 Installation Manual

Samsung batter installation manual
Hide thumbs Also See for OfficeServ 7100:
Table of Contents

Advertisement

CHAPTER 2.
This chapter describes how to install an OfficeServ 7100 cabinet on the ground, inside rack
or on a wall depending on the installation environment.

2.1 Procedure for the System Installation

The procedure of system installation is as follows:
1) Install the cabinet on the ground, inside rack or on a wall depending on the installation
environment.
2) Ground to the ground lug behind the basic cabinet.
3) Insert the MP10/11 board into the slot 0 of the basic cabinet.
4) Insert various interface boards into the universal slots(slot 1 and slot 2).
5) Connect an external battery.
6) Connect input power of AC 230 V..

2.2 Selecting Installation Method

The OfficeServ 7100 cabinet can be installed on the ground, inside a 19-inch rack or on a
wall depending on the number of cabinets and environment of the installation area.
© SAMSUNG Electronics Co., Ltd.
Installing Cabinets
OfficeServ 7100 Installation Manual
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents