Error E031
1 comments:
Mr. Anderson
April 4, 2025
Error E031 on the Power One Aurora PVI-3.0-TL-OUTD inverter indicates that the input channel operation mode selection switch is set to PAR (parallel), which may be incorrect. This can prevent the inverter from establishing a connection with the grid. To resolve this, check the status of the selection switch for the input channel operating mode and verify jumper settings between the input channels.
This answer is automatically generated
Nigel Peacock
April 21, 2025
Following installation of a smart meter, Display shows missing grid
Related Manuals for Power One Aurora PVI-3.0-TL-OUTD
PHOTOVOLTAIC INVERTER INSTALLATION AND CONFIGURATION MANUAL SAVE THESE DOCUMENT IN A SAFE PLACE! IMPORTANT SAFETY INSTRUCTIONS! This manual contains important safety instruction that must be followed during the installation and start- up of the device. It’s recommended to give special attention to the installation instruction in order to reduce the risks of electric shock and prevent damage to the device.
Page 3
Photovoltaic Inverters INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS This document describes the installation and configuration procedure for Power-One Aurora Photovoltaic Inverters. The models this document refers to are shown in the table below. SINGLE PHASE THREE PHASE PVI-3.0-TL-OUTD PVI-8.0-TL-OUTD PVI-3.0-TL-OUTD-S PVI-8.0-TL-OUTD-S...
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS CONTENTS USEFUL INFORMATION AND SAFETY REGULATIONS 1.1. Certification label and symbols used PACKAGE CONTENTS INSPECTION SELECTION OF INSTALLATION LOCATION WALL MOUNTING ELECTRICAL CONNECTIONS (AC, DC SIDE AND PE CONNECTION) 5.1. Selection of the AC grid connection cable 5.2.
Photovoltaic Inverters 1. USEFUL INFORMATION AND SAFETY REGULATIONS This manual contains important safety instructions which must be carefully followed during the installation and commissioning of the device. It is advisable to pay particular attention to the paragraphs marked with the symbol , this will reduce the risk of electric shock and prevent damage to the device.
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 1.1. Certification label and symbols used Shall a verification of the specifications or of the main features of the purchased model be needed, it is possible to check the certification label, as the one shown in the example below, on the right side of the inverter.
Photovoltaic Inverters 2. PACKAGE CONTENTS INSPECTION Check that the package contents comply with the following list: • PVI-xx-TL-OUTD-yy Inverter [1 piece] • Wall mounting bracket [1 piece] • Installation Manual [1 piece] • CD with communication SW and documentation in electronic format [1 piece] • ...
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 3. SELECTION OF INSTALLATION LOCATION The installation location of the AURORA inverter must be chosen taking in account the followings: • Choose a location sheltered from direct sunlight or other sources of heat. • ...
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 5. ELECTRICAL CONNECTIONS (AC, DC SIDE AND PE CONNECTION) Warning! The inverters to which this document relates to are WITHOUT ISOLATION TRANSFORMER (transformer-less). This type involves the use of insulated photovoltaic panels (IEC61730 Class A Rating) and the need to maintain the photovoltaic generator floating with respect to earth: no pole of the generator must be connected to earth.
Photovoltaic Inverters 5.1. Selection of the AC grid connection cable The AC grid connection cable must be selected based on the criteria below. • Cable type: The choice of the type of cable for the connection to the AC grid depends on the type of inverter to be installed (single-phase or three-phase) and on the protective earth (PE) wiring;...
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 5.2. AC side connections Warning! Before performing any of the operations described below, ensure the AC line downstream the inverter has been correctly disconnected. • Remove the inverter’s front panel by unscrewing the screws on the panel with the Torx T20 wrench provided.
Page 13
Photovoltaic Inverters • Insert the AC grid and PE connection cables into the inverter, passing them through the previously mounted cable glands. • Strip back the AC grid and PE connection cables: 10 mm for PVI-3.0/3.6/4.2/8.0/10.0/12.5-TL-OUTD models, 12-13 mm for PVI-5000/6000-TL-OUTD models. • ...
Page 14
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS Note: In the PVI-5000/6000-TL-OUTD models, a WAGO screwdriver allowing the terminal block’s contacts to be opened is provided in the special kit. The procedure for opening the contacts and tightening cables is as follows: 1) Insert the screwdriver in slot with the screwdriver facing downwards;...
Photovoltaic Inverters 5.3. DC side connections • Check the polarity of each couple of cables that must be connected to the inverter input: mark the cable corresponding to the positive pole so as to be able to distinguish it from the one corresponding to the negative pole.
Page 16
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS MOUNTING PROCEDURE FOR WEIDMÜLLER QUICK FIT CONNECTORS • Strip back the cable to which the connector will be applied (after verifying it complies with the connector limitations). • 15 mm Insert the cable in the connector until a locking “click”...
Photovoltaic Inverters 6. CONFIGURATION OF INPUT CHANNEL OPERATING MODE The two input channels can be configured in two modes: independent mode and parallel mode. The selection of the configuration of the input channels depends on the photovoltaic generator features and on the power and current limitations of the inverter, as well as design choices and installation needs.
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 6.1. Configuration of the input channels in parallel mode In case the input channels have to be used in parallel mode, follow the procedure below: • Remove the front panel of the inverter. • ...
Photovoltaic Inverters 7. SIGNALS TERMINAL BLOCKS 7.1. RS485 communication line connection The RS485 communication port is the inverter’s communication port. AURORA uses a HALF-DUPLEX RS485 communication line made up of two transmission reception lines (+T/R and –T/R) and a reference communication line (RTN): all three lines must be wired in a daisy-chain (“in-out”).
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 7.2. Using the alarm terminal block The alarm terminal block makes the contacts of a relay available to indicate configurable alarm conditions. The alarm contact is available under normally open (N.O.) or normally closed (N.C.) operation compared to the common terminal (C).
Photovoltaic Inverters 8. PRE-COMMISSIONING CHECKS Warning! Carrying out preliminary checks before commissioning the inverter is always recommended; this way you avoid possible damage to the unit that could be caused by its faulty installation. The main checks to be performed are summarised in the following chapters. 8.1.
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 8.2. Mechanical checks • Make sure the cable glands are mounted properly. The cable glands must be adequately locked and prevent any movement of the cable. Also make sure the cable glands are solidly fixed to the inverter’s chassis.
Photovoltaic Inverters 9. USER INTERFACE AND USE OF THE DISPLAY Aurora inverters are equipped with an LCD display, four buttons for menu navigation and three LEDs indicating the device status. 9.1. Status LEDs Aurora inverters are equipped with three LEDs that indicate real-time device status and any faults or errors: a green “POWER”...
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 9.2. Use of the display The display allows to set the initial system configuration (Selection of grid standard, date/time, language, RS485 address, activation voltage, MPPT scanning, etc.), the advanced configurations of the grid parameters and of the interface protections and to view real-time or historical energy production data.
Page 25
Photovoltaic Inverters The list of the available Nations is reported in table below: MONO-PHASE INVERTER THREE-PHASE INVERTER NATION (SHOWN ON NATION (SHOWN ON DEFAULT LANGUAGE DEFAULT LANGUAGE DISPLAY) DISPLAY) SLOVENIA No Nation English English BRASIL Australia English English BENELUX Dutch C1011 110 French China...
Page 26
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS To set the Nation, perform the following: NATION SELECTION PROCEDURE – SINGLE-PHASE INVERTER (PVI-3.0/3.6/4.2/5000/6000-TL-OUTD) • When the inverter starts up for the first time the list of selectable Nations is shown on the display. • ...
Page 27
Photovoltaic Inverters NATION SELECTION PROCEDURE – THREE-PHASE INVERTER (PVI-8.0/10.0/12.5-TL-OUTD) • When the inverter starts up for the first time the following message is shown on the display: • Press the “ESC” button to access the main menu, then choose INFO > COUNTRY SELECT. > NEW VALUE, then select the Nation corresponding to your country and press the “ENTER”...
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 10.2. Connection to the grid • After you have set the Nation value, the message “Inizializing...Please Wait” is displayed. Depending on the input voltage value, the inverter will show various messages on the display and change the behaviour of the three LED: INPUT VOLTAGE DISPLAY MESSAGE LED STATUS...
Photovoltaic Inverters 11. CONFIGURATION 11.1. Configuration of basic parameters The display allows to access the configuration of the basic parameters, available in the “SETTINGS” menu. To access the configuration menu from the initial screen, press the “ESC” button and select the “SETTINGS” menu;...
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 11.2. Advanced configurations from the “SERVICE” menu The display allows access to the advanced configurations of the grid parameters and interface protections, available through the “SERVICE” menu. Accessing the “SERVICE” menu requires a second-level password that can be obtained by registering on the https://registration.power-one.it website and submitting a request through the form available in the “REQUEST PASSWORD INVERTER”...
Page 31
Photovoltaic Inverters The following table reports a list of the parameters that can be configured. DISPLAY PARAMETERS DESCRIPTION Enabling/disabling the negative pole grounding mode (to be enabled only if a “negative Amorph. Mode* grounding kit” is installed on the inverter) Set U>>...
Page 32
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS DISPLAY PARAMETERS DESCRIPTION Disable U> Enabling/disabling the “restrictive” overvoltage protection Dis. U> (10 min) Enabling/disabling the “restrictive” overvoltage protection (average over 10 minutes) Disable U< Enabling/disabling the “restrictive” under-voltage protection Disable F>> Enabling/disabling the “permissive”...
Photovoltaic Inverters 12. START-UP TROUBLESHOOTING Start-up Troubleshooting concerns the solving of the main problems that can occur during the first start-up phase. Should problems arise in the unit’s commissioning phase, it is possible to solve the problem by looking for the corresponding problem in the table and following the instructions.
Page 34
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS PROBLEM POSSIBLE CAUSES CHECKS/POSSIBLE SOLUTIONS • The inverter does not establish The grid voltage exceeds the Reduce the power of the photovoltaic generator parallel with the grid. maximum value allowed for (by disconnecting one or more strings or creating the grid connection.
Page 35
Check that each inverter is set to a 19200bps None communication speed (baud- baud-rate. rate). • Power One recommends the purchase of the PVI- Use of an inappropriate signal RS485_RS232 or PVI-USB-RS485_232 converter. converter. If a PVI-USB-RS485_232 converter is used, check that the output is correctly set.
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 13. ROUTINE MAINTENANCE Warning! It is recommended that maintenance operations be only performed by qualified personnel or Power-One personnel (under a servicing contract). Routine maintenance, although not mandatory, is recommended to maintain efficient operation of the photovoltaic installation.
Photovoltaic Inverters 14.1. Replacing the input fuses Warning! Using fuses with inappropriate specifications may irreparably damage the unit. Any consequential damage to the inverter is not covered by the warranty. Warning! In case of damage of one or more input fuses, the inverter (not being able to monitor the status of fuses) will continue to export energy to the grid without signaling any alarm.
Page 38
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS • Use a multimetre to ensure that no voltage is present between the positive and negative poles of the DC inputs. • Depending on the presence of fuse holder extractors or safety caps, follow the corresponding procedure: PROCEDURE FOR THE REPLACEMENT OF INPUT FUSES (MODELS EQUIPPED WITH FUSE HOLDER EXTRACTORS) • ...
Photovoltaic Inverters 14.2. Replacing the internal battery The replacement of the internal battery must be carried out when: − The display shows the error W012 “Battery Low”. − The settings of current date / time are frequently reset. To replace the internal battery follow the procedure below: • ...
INSTALLATION AND CONFIGURATION MANUAL FOR AURORA PHOTOVOLTAIC INVERTERS 15. TROUBLESHOOTING HELP If the problem is not solved with the start-up troubleshooting (see Par. 12) nor with the complete troubleshooting provided in the user manual, follow the procedure below: • Check that connections between the AURORA, the photovoltaic generator and the grid have been correctly carried out.
Photovoltaic Inverters 15.1. System structure You are recommended to fill in this page with the information relating to the system and possibly supplement it with a copy of the system’s wiring diagram. The information on this page could be very handy, should it be necessary to contact the Power-One customer service.
Photovoltaic Inverters APPENDIX A PIN-OUT OF RJ12 / RJ45 CONNECTORS RJ12 CONNECTOR PIN # SIGNAL NAME DESCRIPTION Not Used + Data Line Required for RS485 communication Remote OFF Required for Remote OFF control - Data Line Required for RS485 communication Not Used Signal Return Common reference for logical signals...
APPENDIX APPENDIX D RETAINING CLIPS FOR MULTICONTACT / WEIDMÜLLER QUICK FIT CONNECTORS For countries that require compliance with the UTE-15-712-1 directive is necessary to use additional retaining clips to assemble on the quick fit connectors in order to prevent accidental disconnection. These retaining clips are not supplied in the accompanying assembly kit and they can be ordered directly from Power-One, quoting the following codes: 3G830020000 for Multicontact quick fit connectors...
Page 47
Photovoltaic Inverters Note: After assembly, the retaining clip cannot be removed. Once the male connector has been fitted to the female connector equipped with the clip, they can only be disconnected using the specific tool illustrated in the figure below: DISCONNECTION TOOL FOR RETAINING CLIPS MULTICONTACT WEIDMÜLLER...
APPENDIX APPENDIX E TECHNICAL DATA MODEL PVI-3.0-TL-OUTD PVI-3.6-TL-OUTD PVI-4.2-TL-OUTD INPUT PARAMETERS Nominal DC Power [kW] 3,12 3,75 4,375 Max. Recommended DC Power [kW] 4,15 4,82 Operating Input Voltage Range [V] 0,7xVstart - 580 Full Power MPPT input voltage range (symmetrical load) [V] 160-530 120-530 140-530...
Page 49
Photovoltaic Inverters MODEL PVI-5000-TL-OUTD PVI-6000-TL-OUTD INPUT PARAMETERS Nominal DC Power [kW] Max. Recommended DC Power [kW] 5,75 Operating Input Voltage Range [V] 0,7xVstart - 580 Full Power MPPT input voltage range (symmetrical load) [V] 150-530 180-530 Full Power MPPT input voltage range (asymmetrical load) [V] 220-530 (@ 4kW) / 90-530 (@ 0,8kW) 220-530 (@ 4kW) / 120-530 (@ 2,2kW) Absolute Max.
Page 50
APPENDIX MODEL PVI-8.0-TL-OUTD PVI-10.0-TL-OUTD PVI-12.5-TL-OUTD INPUT PARAMETERS Nominal DC Power [kW] 8,25 10,3 12,8 Max. Recommended DC Power [kW] 11,4 14,3 Operating Input Voltage Range [V] 0,7xVstart - 850 Full Power MPPT input voltage range (symmetrical load) [V] 270-750 300-750 360-750 Full Power MPPT input voltage range (asymmetrical load) [V] 380-750 (@ 6,8kW) / 195-750 (@ 3,5kW) 380-750 (@ 6,8kW) / 195-750 (@ 3,5kW) 445-750 (@ 8kW) / 270-750 (@ 4,8kW)
Need help?
Do you have a question about the Aurora PVI-3.0-TL-OUTD and is the answer not in the manual?
Questions and answers
Error E031
Error E031 on the Power One Aurora PVI-3.0-TL-OUTD inverter indicates that the input channel operation mode selection switch is set to PAR (parallel), which may be incorrect. This can prevent the inverter from establishing a connection with the grid. To resolve this, check the status of the selection switch for the input channel operating mode and verify jumper settings between the input channels.
This answer is automatically generated
Following installation of a smart meter, Display shows missing grid