Uem Startup/Powerdown Sequence - Nokia 616 Service Manual

Carkit phone (tfe-4/rv-1)
Hide thumbs Also See for 616:
Table of Contents

Advertisement

Nokia Customer Care
The communication between the UEM and the UPP is done on the bi-directional CBUS
and DBus. The CBUS is controlled by the MCU and can operate at a speed of maximum 1
MHz. The DBus is controlled by the DSP and can operate at a maximum speed of 13 MHz.
Both processors are located in the UPP.
UEM
The UEM is one of the two Asics in the baseband module.
UEM Startup/ Powerdown Sequence
The functional behavior of the UEM can be divided into 7 different states. Since the UEM
controls the regulated power distribution of the phone, each of these states affects the
general functionality of the phone:
• No supply
• Backup
• Power off
• Reset
• Power on
• Sleep
• Protection
Because the Junction Board switches off the Engine Power supply (VEBpwr on junction
board, VBAT on the Engine Board) the UEM will be started by Poweron mode. During the
Power-Up Sequence the UEM detects that the Poweronx line is pushed to ground by the
Junction Board.
Issue 2.0 Mar/2005
Company Confidential
Copyright © 2005 Nokia Corporation.
Company Confidential
TFE-4/RV-1
TF4 Technical Information
Page 8b-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

610

Table of Contents