GE CV936 Owner's Manual And Installation Instructions page 15

Table of Contents

Advertisement

Installation instructions
I4] Alternate
Mounting
Method
IMPORT_T: Voraaaitionals.pport ariato n,immize
iNSTALL HOOD TO SOFFIT
OR BENEATH CABINETS
SKIP THIS STEP iF USING WALL MOUNTING
METHOD
iMPORTANT: Soffit framing
must be capable
of supporting
100 Ibs.
When
necessary,
the hood
may be installed
so that
it is supported
by the soffit.
* The soffit should
be constructed
with 2 x 4's.
* Determine
the installation
location.
* Continue
tile centerline
forward
on the bottom
of the cabinet
or soffit.
30"Models
"A ....
B"
Centerline to
Opening
Center of Stud
For Ductwork
14-1/2"
10-3/4"W x 8-7/16"D
* Mounting
screws must
be secm'ed
to 2 x 4 studs
(Dim.
"A") at locations
shown
in the above
chart.
* Allow minimum
opening
(Dim.
"B") to
accommodate
the duct transition
ill the soffit.
RearWall
I
I
2-3/8" _
,, I
,,
! 5-3/8 T
5-3/8 4
i
¢
: 817/16"
•........ _ ......... i;
I
TopView,FrontSide
Cut a 10-3/4"x 8-7/16" hole through bottom of soffit or cabinet for
duct transition as shown.
vibration
during
operation,
we strongly
recommend
that the hood
also be secured
to the back wall with
wall fasteners,
2-9/16"
7-1/16"
30"Models
_14-1/2'_{_14-1/2
't
t
2-3/8{"1 _ 10-3/4"
i
1
,
iI
,
d;
18-7/16"
L
........ . .......
I
29-7/8'_
TopView,FrontSide
* Drill
four
1/8"
pilot
holes
in locations
shown.
- If mounting
to the
tmderside
of a cabinet
*_ith
a recessed
bottom,
install
shims
to fill the
_'l 'q )
/
,,
Cabinet
;
or
"" Transition",
Soffit
1/#' Gap
EngageKeyholeSlots
andPushBack
to Wall
=
_kAdd Shims
If Bottom
IsRecessed
=
,-b--Back
Wall
* Drive mortaring
screws into
tile studs
until they
protrude
1/4".
This
l/4"
gap will provide
clearance
to engage
the keyhole
slots ill the top of the hood.
* Lift hood
onto
mounting
screws.
Slide back against
tile real" wall.
* Pull house
wiring
through
the knockout
at the rear
or the top of tile hood.
* Tighten
mounting
screws.
15

Advertisement

Table of Contents
loading

Table of Contents