Beko METPOINT OCV Installation And Operation Manual page 32

Oil vapour measuring device with sampling probe
Table of Contents

Advertisement

Installation
Installation of the evaluation unit (steps 15 – 19)
32
15. Determine the place of installation of the
evaluation unit, taking into account the
available length of the signalling cable.
16. The standard length is 5 m
17. Drill four mounting holes as illustrated here
for the respective fitting screws.
18. Prior to mounting the device, the lateral
panels covering the screwing zone must be
levered out carefully.
19. Fix the housing of the evaluation unit on the
wall in the vicinity of the probe. For this
purpose, use the four through bores Ø 6
mm.
You will find a hole director in the Appendix to
these operating instructions.
Make sure that a screwdriver with a sufficiently
long shaft is available.
WARNING!
Unauthorised intervention!
Unauthorised interventions may endanger
persons or plants and lead to a malfunction.
Damaging the sealing of the housings of the
sensor unit and the evaluation unit invalidates
the warranty.
METPOINT
®
OCV

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents