Chapter 3 Setup

7.9.5 BMC OFF

Overview
Use this page to turn off (shutdown) BMC. This operation is performed to replace BMC board safely.
Administrator privilege is required to use this feature.
Click the [Maintenance] tab to display available menus.
Select [BMC OFF] from menu tree in left pane.
Buttons
① [BMC OFF] button
Press the [BMC OFF] button to shutdown BMC so that BMC board can be replaced safely.
② [Reload] button
Press the [Reload] button to display the latest information.
Important
• This operation must be performed only while the server is powered off
• Wait for 30 seconds till all status LEDs of all MGBs go out.
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
7. Using Remote Management
395

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800 a1040bExpress5800 a2020bExpress5800 a2040b

Table of Contents