Installation Diagram Of Indoor Unit And Outdoor Unit; Indoor Unit Gas Leak Test Check Point; Drain Hose Installation - Samsung AQ07A1VE Service Manual

Room air conditioner
Hide thumbs Also See for AQ07A1VE:
Table of Contents

Advertisement

3-2-2 Installation diagram of indoor unit and outdoor unit

A

Indoor unit gas leak test check point

Indoor unit
Piping
1
B

Drain hose installation

Cut the piping hole
Cut the piping hole
sloped slightly
sloped slightly
1
7K/9K BTU
2
12K BTU
3
4
5
Samsung Electronics
3
2
Tape vinyl
5
6
Piping (Liquid) 1/4"
Piping(Gas)3/8"
Piping(Gas)1/2"
Installation tube
Vinyl tape
Putty
Operating Instructions and Installation
Piping may be laid to the rear, left,
right or down .
Right
Rear
Down
125mm
or more
7
A
B
Remote control holder
4
10
6
Clamper tube
7
Installation plate
8
Pipe-connection
9
Screw
10
Drain hose
Left
Rear
125mm or more
Remote control
3-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents