C h a p t e r 2
___________________________________________________________________________________
S
1
I
ECTION
NSTALLING THE
1.1
1.2
___________________________________________________________________________________
Hardware, Installation and Maintenance Manual
IPK II IAD(8)-U( ) ETU Setup
IAD ETU
System Requirements
The IAD(8)-U( ) ETU can be viewed and installed like any other ETU used in
the KTS system. Refer to
Installation. However, the CAT5 Ethernet cable plugs into the Ethernet
connector on the front of the ETU, and not through the regular connections as
with other interface boards.
1.
Set the IAD(8)-U( ) ETU to desired card type in accordance with the dip
switch settings. Refer to
1-3.
2.
Place the IAD(8)-U( ) ETU in the KSU.
3.
Connect the Ethernet cable to J6 connector.
4.
The CH1~CH8 LEDs start to run indicating that the system is initializing
the IP networking parameters. The status LEDs are red. Refer to
1-1 IAD(8)-U( ) LED Boot Sequence Indications on page
5.
Once all LEDs are off and the status LED (D12) is flashing red, the IAD
(8)-U10 ETU can be set up with the system.
Installation Precautions
As with all static sensitive devices, the ETU must be installed following the
Electra Elite IPK II hardware installation general directions.
Appendix D Electra Elite IPK II IAD(8)-U( ) ETU
Table 1-2 IAD(8)-U( ) Switch Settings on page
Table
1-2.
2 - 1