1.5
Equipment Installation Patterns and Service Area
This section explains the installation pattern for each piece of equipment and the
service area required for each installation pattern.
Service area for the PRIMEQUEST 580A/540A/580/540/480/440 main unit
(Figure
Service area for the PRIMEQUEST 580A/540A/580/540/480/440 main unit and
the Extended I/O Cabinet (Figure
Service area for the PRIMEQUEST 580/480 main unit and the Extended Power
Cabinet (Figure
Service area for the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet,
and the Extended Power Cabinet (Figure
Figure 1.12 Service area for the PRIMEQUEST 580A/540A/580/540/480/440
U41631-J-Z816-5-76
1.12)
1.14)
804 (31.7)
38 (1.5)
Service area
PRIMEQUEST
580A/540A/580/
540/480/440
main unit
Service area
Front
* This is a top view of the unit.
1.5 Equipment Installation Patterns and Service Area
1.13)
1.15)
28 (1.1)
Unit: mm (in.)
2
Installation area: 2.2 m
(including service area)
main unit
1-37