CHAPTER 1 Installation Reference

1
This chapter provides the information required for installing the PRIMEQUEST
580A/540A/580/540/480/440 server.
1.1

Equipment Configuration

Table 1.1
specifications.
Unit
PRIMEQUEST 580/
480 main unit
PRIMEQUEST 540/
440 main unit
Extended Power
Cabinet
Extended I/O Cabinet Cabinet that contains PCI_Boxes and that
U41631-J-Z816-5-76
lists the units that comprise the PRIMEQUEST server and their
Figure 1.1
to
Figure 1.4

Table 1.1 Units and their specifications

Unit that can contain up to eight system
boards (maximum of 32 CPUs) and up to
eight IO Units
Unit that can contain up to four system
boards (maximum of 16 CPUs) and up to
four IO Units
Power supply cabinet that is connected to
the PRIMEQUEST 580A/540A/580/540/
480/440 main unit for dual power feed
configuration
is connected to the PRIMEQUEST 580/
480 or PRIMEQUEST 540/440 main unit
show a sample system configuration.
Specifications
Remarks
Standard equipment
Standard equipment