Configuration Switches - GE P485 Instruction Manual

Modbus to profibus converter
Table of Contents

Advertisement

INSTALLATION
CONFIGURATION
SWITCHES
2–6
Table 2–5: P485 status indicators
Number
Description
1
Profibus online
2
Profibus offline
3
Not used
4
Profibus
diagnostics
5
Subnet status *
(Modbus)
6
Device status
*
This LED turns green when all transactions have been active at least once. This includes any
transactions using "change of state" or "change of state on trigger". If a timeout occurs on a
transaction, this LED will turn red.
The configuration switches are used to set the Profibus node address. Normally, these
switches are covered by a plastic hatch. Note that the node address can not be changed
during runtime, i.e. the P485 requires a reset for any changes to have effect. Recycle the
power supply to reset the module
Figure 2-10: P485 configuration switches
The node address is configured using two rotary switches as follows:
Profibus node address = (Switch B× 10) + (Switch A × 1)
State
Status
Off
Not online
Green
Online
Off
Not offline
Red
Offline
-
-
Off
No diagnostics present
Red, flashing 1 Hz
Error in configuration
Red, flashing 2 Hz
Error in user parameter data
Red, flashing 4 Hz
Error in initialisation
Off
Power off
Green, flashing
Initializing and not running
Green
Running
Red
Stopped or subnet error, or timeout
Off
Power off
Alternating Red/
Invalid or missing configuration
Green
Green
Initializing
Green, flashing
Running
Red, flashing
If the device status LED is flashing in a
sequence starting with one or more red
flashes, note the sequence pattern and
contact GE Multilin
A
B
P485 MODBUS TO PROFIBUS CONVERTER – USER GUIDE

Advertisement

Table of Contents
loading

Table of Contents