Samsung DV331AGR/XAA-0000 User Manual page 19

Gas & electric dryer
Table of Contents

Advertisement

4.
Review the Exhausting
section
before installing
the exhaust system.
Install the ductwork
from your dryer
to the exhaust
hood. The crimped
end of the duct sections
must point away from your dryer.
DO NOT use sheet metal screws
when assembling
ducting.
These joints should
be taped.
Never use plastic
flexible
exhaust
material,
Tip for tight installations:
install a section
of exhaust system
to your dryer before putting it in place.
Use duct tape to secure this section
to your dryer, but do not cover ventilation
slots at the back of the
unit in the dryer cabinet.
5.
Review
Electrical
Requirements
section.
BEFORE
OPERATING
OR TESTING,
follow the grounding
instructions
in the Grounding
section.
U.S. MODELS:
IMPORTANT
- All U.S. models
are produced
for a 3-WIRE
SYSTEM
CONNECTION.
The dryer frame is grounded
to the neutral conductor
at the terminal block.
A 4-WIRE
SYSTEM
CONNECTION
is required for new or remodeled
construction,
mobile
homes,
or if local codes do not permit
grounding
through
neutral. If the 4-wire system
is used,
the dryer frame cannot
be grounded
to the neutral conductor
at the terminal
block.
Refer to the
following
instructions
for 3- and 4-WIRE SYSTEM
CONNECTIONS.
Remove
the terminal
block cover
plate.
Insert the power
cord with a UL-listed
strain relief through
the hole provided
in the cabinet
near the
terminal
block.
(_A
strain relief must be used.
Do not loosen the nuts already installed on the terminal block.
Be sure they are tight.
Use a 3/8" (1 cm) deep well socket.
DV331AE-0302dA-01
EN.indd
Sec5:19
installing your dryer
19
2011-03-28
12:18:05
I

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents