Download Print this page

GE JGP637 Owner's Manual And Installation Instructions page 21

Built-in gas cooktops
Hide thumbs Also See for JGP637:

Advertisement

Installation
Instructions
Installing the Cooktop
cont.
Complete the connection
with a coupling
Pressure
Regulator
Coupling
--
Shut Off
Valve
--_
Install a coupling
between
the
regulator
and the
shutoff valve to
complete
the
connection.
47
i i
I
Electrical
I
Outlet
I
12" Below
Countertop
Check for Leaks
After connecting
the cooktop to gas, check
system for leaks with a manometer.
If a
manometer
is not available,
turn the gas
supply on to the cooktop
and use a liquid
leak detector
at all joints and connections
to check for leaks.
Tighten all connections
if necessary
to
prevent gas leakage
in the cooktop
or
supply line.
Check alignment
of valves after connecting
the cooktop
to the gas supply to be sure the
manifold
pipe has not been moved. A
misalignment
could cause the valve knob
stem to rub on the control panel, resulting
in a gas leak at the valve.
DO NOT USE OPEN FLAME
TO
CHECK
FOR LEAKS!
Disconnect
this cooktop and its individual
shutoff valve from the gas supply piping
system during any pressure testing of that
system at test pressures greater than 1/2" psig.
Isolate
the cooktop
from the gas supply
piping system by closing its individual shutoff
valve during any pressure testing of the gas
supply system at test pressures
equal to or
less than 1/2" psig.
_-_ INSTALLATION
OVER
BUILT-IN OVEN
See built-in oven installation
for complete
installation
instructions.
STREET EL
T
5" TO CENTER
OF 2" DIA. HOLE
FROM COUNTERTOP
l
2" DIA. HOLE (207t8"
FROM FRONT OF
COUNTERTOP TO
HOLE CENTER)
21

Advertisement

loading