Preparing the SF
6
Process
11- 2016
Installation
Pre- filling with SF
gas bottle
The table below gives the steps of preparing the SF
Step
1
Remove the cover (6) and plug (7)
from the SF
6
2
Fit the pressure reducer (10) on
the SF
gas bottle (8).
6
3
Briefly open the SF
(9) and the cock (11) of the pres-
sure reducer to eliminate any air
inside the piping (approx. 20 s at
low flow- rate).
4
Close the SF
and the cock (11) of the pressure
reducer.
NOTE : Keep the end of the
tube (12) in high position to
keep the SF
contains and to prevent damp
air from entering.
GE Information
gas at 0.05 MPa
6
Action
gas bottle (8).
8
gas bottle tap
6
gas bottle tap (9)
6
9
gas which it
6
END OF PROCEDURE
gas bottle :
6
Diagram
7
6
8
SF
6
SF
6
10
Open
9
SF
6
11
Closed
12
SF
6
11
Closed
L31- 951EN/06
2/4

Advertisement

Table of Contents
loading

Table of Contents